Field glossary · equipment
Type I hood
A Type I kitchen hood is selected for grease or smoke capture at a documented exhaust rate and mounting arrangement. Under the 2024 IMC, the hood listing or applicable capacity rules establish that rate; a fan's total CFM can include air injected inside the hood. Separate that cavity supply, read the installation label and prove containment with the full cooking line and air systems operating.
A grease hood over cooking appliances, with listed filters, a welded grease duct, clearances, and suppression
Does an electric appliance avoid the grease-hood requirement?
The 2024 IMC, Section 507.1, recognizes an electric cooking appliance listed and labeled under UL 197 specifically for reduced grease emissions. An ordinary UL 197 electrical-safety listing does not establish that reduced-grease qualification. Record the listing evidence for the exact model when applying this exception; electric heat by itself says nothing about the grease duty. IMC change M44-21.
Keep that exception evidence with the exact appliance model and installation instructions. A generic product description such as ventless does not identify which exception or conditions apply. Use the kitchen exhaust guide for the grease duct, cleaning and fire-protection scope once the cooking arrangement is established.
The hood label supplies the installation numbers
Greenheck's canopy-hood installation manual places the Type I hood's label on the inside end panel and identifies its cooking-surface temperature limits, overhang requirements and minimum exhaust airflow as installation inputs. Photograph that label before enclosing adjacent work; retain it with the approved appliance lineup. Greenheck manual 452413.
Greenheck gives 80 inches above finished floor as a typical canopy-hood mounting height, measured to the front lower edge, while directing the installer to the actual label for the required height. A floor-to-hood measurement and an appliance-to-hood measurement are different checks. Raising the hood to clear a tall appliance also changes the geometry relative to every other appliance beneath it.
Which airflow belongs on the acceptance report?
The 2024 IMC, Section 507.2.10, defines net hood exhaust by subtracting air supplied directly into the hood cavity from total hood exhaust. Supply delivered to the room or transferred from an adjacent space is a separate balance term. A fan reading alone therefore does not establish the hood's net capture airflow. IMC capacity change record.
The 2024 IMC, Section 507.1.1, permits the exhaust rate established by the hood listing or the applicable hood-capacity section. Use the listed arrangement's appliance duty and installation conditions with its airflow requirement. Put direct cavity supply on a separate line of the balance report; the makeup-air guide covers air supplied to the room.
Greenheck manual 452413 directs installers using its Shortridge filter-face measurement methods to turn off internal short-circuit makeup air while measuring exhaust through the filters. Record that configuration with the airflow result. The capture test then uses the operating air systems, so these two checks require separate records.
Capture must hold with the cooking line hot
The 2024 IMC, Section 507.1.7.1, requires the capture-and-containment test with appliances at operating temperatures, outdoor makeup air operating and recirculated space-conditioning air operating. Verify containment visually with actual or simulated cooking smoke or steam. Airflow measured in CFM and containment observed under those conditions are separate acceptance results. HoodMart installation manual, August 2025, page 26.
Restore the operating air configuration after the filter-face measurement and record the tested appliance positions. A later equipment move or supply-diffuser change can then be compared with a documented capture result.
Distinctions
- Type II hood
- The designation follows the effluent being removed. A heat-and-moisture application does not acquire a grease-handling approval merely because its hood resembles a Type I canopy.
- Fan airflow
- Total exhaust at the fan can include air introduced directly into the hood. Net hood exhaust accounts for that internal supply before comparison with the required capture airflow.
Field example
A hood schedule requires 2,800 CFM net exhaust. Balancing records 3,200 CFM total exhaust and 600 CFM supplied directly into the cavity. Applying the IMC net-airflow rule gives 3,200 - 600 = 2,600 CFM, leaving a 200 CFM shortfall. The total exhaust exceeds 2,800 CFM, but the required net airflow has not been delivered.
Repeat kitchen-ventilation work follows public facility upgrades; PorchRocket Bid Control shows past awards for contractors tracing which agencies buy hood and makeup-air work.
Frequently asked questions
Where should the hood installation label be photographed?
For the Greenheck canopy hoods covered by manual 452413, look on the inside end panel. Include the model identification and airflow, mounting and appliance-temperature information in the equipment record.
Can the airflow result stand after the appliance lineup changes?
Retain the old result as the record of the tested arrangement. Compare the revised lineup with the hood label and approved design, then document capture under the new operating configuration.
Sources checked
- Florida Building Commission: 2024 IMC changes, M40-21 and M44-21, hood ratings, testing and reduced-grease exception
- Greenheck 452413: Kitchen Hoods Type I and Type II installation and operation manual
- HoodMart: Commercial Canopy Kitchen Hoods installation manual, revised August 2025, page 26; 2024 IMC performance and capture tests