Field glossary · safety
Clearance to combustibles
Apply clearance to combustibles from the exact model's directional diagram and measuring surfaces. NDUSTRIA's GG30, GG33, GG35 and GG40 ceramic heaters require 72 inches below, 30 inches at the sides and 36 inches to the ceiling when mounted horizontally with the standard reflector. These dimensions do not establish tube-heater or grease-duct clearances. Storage height, moving objects and material heat tolerance each need their own comparison with the installed assembly.
The required air gap between a hot grease duct and burnable construction, commonly 18 in unless reduced by a listed method
Measure from the surface named in the diagram
The NDUSTRIA GG manual, February 2020 revision A defines the clearance from the infrared surface or reflector to the combustible item. Measuring from a suspension point or the heater's centerline changes the result. Preserve the manufacturer's drawing with the dimensions taken in the field.
NDUSTRIA's GG30, GG33, GG35 and GG40 are ceramic infrared heaters; with horizontal mounting and the standard reflector, their clearance table assigns 72 inches below, 30 inches to the sides and 36 inches to the ceiling. These are model-specific values, not a general table for gas heaters or grease ducts.
At 35-degree mounting, the same GG models require 72 inches below, 36 inches in front and 30 inches behind, measured in the table's directions. Keep the heater type and mounting angle on the clearance sketch; a tube-heater layout needs its own model's diagram.
Allow for objects that move into the heated space
NDUSTRIA explicitly includes overhead doors, vehicles on lifts and cranes among moving objects that must maintain clearance. An empty bay measurement is incomplete if a raised vehicle or open door enters the prohibited space during ordinary use.
Using the cited 72-inch downward clearance, a heater whose specified measuring surface is 14 feet above the floor leaves an 8-foot maximum height for combustible material directly below that surface. A 9-foot stack leaves only 60 inches and misses the requirement by 12 inches. Side and end limits remain separate checks.
Map the operating positions as well as the parked positions. Storage limits belong at the place where staff control stacking, and the manual calls for posted maximum stacking heights in combustible-storage locations. A revised rack arrangement needs a new comparison with the same heater envelope.
A material temperature rating is a different limit
The GG manual extends its separation dimensions to other materials damaged at 90°F above ambient and separately addresses low heat tolerance in plastics, vinyl, canvas and similar products. Do not read the clearance as an ignition threshold: a surrounding material's permitted service temperature can impose an additional limit.
NFPA lists the 2027 edition of NFPA 96 for commercial cooking ventilation and fire protection as of November 5, 2026. Identify the edition adopted for the job as well as the listing and installation details of any reduced-clearance grease-duct assembly. Record the listed assembly designation, substrate and installation details with the grease-duct documentation, rather than applying the heater dimensions above.
Distinctions
- Service access
- Space needed to inspect, remove or maintain equipment. Its dimensions can exceed the thermal separation.
- Mounting height
- A placement dimension that does not replace the individual combustible-clearance dimensions.
Frequently asked questions
Can I measure clearance diagonally?
Follow the directional dimension and measuring origin in the manufacturer's diagram. A longer diagonal measurement does not establish the required vertical or horizontal separation.
Does clearance end after the installation inspection?
The specified separation must remain available during use. Moving doors, changing storage and equipment on lifts can create a violation after an initially correct installation.
Sources checked
Also defined as
- Landscaping: The distance from the fire and its heat to anything that can burn, horizontal and overhead
- Listed minimum distance from the heater to anything that can burn, in every direction