ANVILFIELD Try FieldOS

Field glossary · material

LP vs natural gas

Propane, commonly called LP, and natural gas require fuel-specific appliance setups. The supply regulator, appliance regulator, burner orifice, and air-mixing arrangement operate as a system. Identify the fuel on the rating plate and the pressure at the measurement point named by that model's manual. A connector that fits and a flame that lights do not establish a correct fuel conversion.

Propane (LP) is heavier than air and pools low, vented low; natural gas is lighter and rises, vented high; orifices and pressure differ

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

Keep each pressure tied to its appliance configuration

WEBER manual 52985, revision 080623 (2023), specifies different operating pressures for the three- and four-burner natural-gas grills it covers. The burner count identifies a configuration in that manual; it is not a sizing rule for other grills.

The WEBER Q LP guide, copyright 2014, specifies an 11-inch-water-column setting for its supplied regulator. In the comparison below, the two natural-gas entries are described as grill operating pressures, while the LP entry is explicitly a regulator setting. Use the model's measurement instructions to identify where a reading belongs.

Manual and fuelCovered configurationPressure specification
WEBER 52985, natural gasThree-burner models7 inches water column, operating
WEBER 52985, natural gasFour-burner models4.5 inches water column, operating
WEBER Q LP guide, propaneSupplied pressure regulator11 inches water column, regulator setting

Inlet pressure and operating pressure answer different questions

GE Appliances specifies 6 to 13 inches of water column at the regulator inlet for natural gas and 11 to 13 inches for propane in its range and cooktop guidance. Those are inlet limits for that appliance class. They do not establish a downstream manifold setting or replace the instructions for the installed grill or fire feature.

GE gives 1 inch of water column as 0.03609 psi. A 7-inch-water-column specification is about 0.253 psi, not 7 psi. Write the unit out in the service record and retain whether the reading was taken upstream or downstream of the regulator. Confusing units or measurement locations can make a valid reading appear badly wrong.

Conversion is an appliance-specific authorization

WEBER manual 52985 prohibits using the opposite fuel and warns against conversion of its fuel-specific grill. GE Appliances, by comparison, includes LP conversion kits with its gas cooking appliances and directs installers to the model's conversion instructions and jurisdictional requirements. A kit supplied for a convertible GE appliance does not authorize modifying the WEBER model.

The outdoor kitchen guide covers enclosure and installation coordination. The fire feature guide covers decorative burner arrangements. Use each appliance's own manual rather than transferring a grill pressure or component to a fire-pit burner.

Distinctions

Water column
A pressure unit expressed as the height of a water column. It is distinct from gas flow or heat input.
Fuel supply versus appliance manifold
Supply pressure exists before the appliance's regulation stages; manifold pressure describes the burner-side condition. Record the point specified for the measurement.

Frequently asked questions

Can a larger or smaller orifice complete the conversion?

The orifice is only one part of the fuel setup. Model approval, regulation, mixing, and labeling still determine whether that appliance is configured for the supplied fuel.

Sources checked

Also defined as

  • Propane is heavier than air and pools low from a tank; natural gas is lighter and comes off a line

Where this shows up

Next step: Track gas equipment projects

Back to the full field glossary