Field glossary · equipment
Upblast fan
Accepting a rooftop upblast fan for kitchen duty requires evidence of its listed application and installed geometry. Intertek identifies UL 705 Supplement SC as the replacement for UL Subject 762 restaurant-exhaust evaluation. Greenheck's CUE/CUBE instructions require separate checks of 40-inch discharge height, 18-inch duct extension, and 10-foot intake separation. An upward-discharge housing photograph cannot establish those dimensions, the grease-exhaust listing, or the installed access hardware.
A roof exhaust fan that discharges vertically up and away from the roof, used for dirty or greasy air
What replaced UL 762 on kitchen fan submittals?
Intertek's standards update states that UL Subject 762 was withdrawn and its restaurant-exhaust requirements incorporated into UL 705 Supplement SC, with the transition effective June 1, 2021. Greenheck's current guidance tells specifiers to use UL 705 Supplement SC for restaurant/grease exhaust. The change explains why an acceptable modern submittal can use a different designation from an older equipment schedule.
UL Standards & Engagement lists UL 705 Edition 7, published July 19, 2017 and revised September 16, 2024, as the active edition. Verify the restaurant-exhaust application in the listing information rather than accepting the general UL 705 designation by itself. That standard also covers other ventilator applications.
Greenheck notes that the product label identifies the listed application without necessarily printing the UL standard number. Photograph the complete listing label and model data. The words describing restaurant exhaust matter more than finding the number 762 on a weathered decal.
Measure the outlet and duct termination separately
Greenheck's CUE/CUBE installation manual requires restaurant-exhaust fan discharge at least 40 inches above the roof surface and the duct extension at least 18 inches above the roof. These are two different measurements. Satisfying the duct-extension dimension does not establish the discharge height.
An installation with its duct extending 20 inches above the roof but its discharge opening only 37 inches above the roof clears the manual's duct minimum and misses its discharge minimum by 3 inches. Measure the completed assembly, including the selected curb and fan, before accepting a replacement on an existing curb.
The same Greenheck manual specifies at least 10 ft between the discharge and a building air intake. Record the actual intake location with the fan dimensions, especially when adjacent rooftop equipment has been replaced or relocated. The commercial exhaust guide addresses discharge recirculation; the model instructions give the dimensional installation checks.
NFPA's current publisher listing is NFPA 96, 2027 edition. The cited Greenheck manual includes references to older NFPA editions, so identify its dimensions as manufacturer instructions and record the code edition adopted for the project separately. Product listing, installation instructions, and an adopted installation standard answer different parts of the acceptance review.
Retain the listing evidence after a replacement
Greenheck's CUE/CUBE instructions call for a grease drain directed to a visible, accessible receptacle and a hinge for kitchen upblast service. Connect those items to the installed model, listing, curb, and accessory submittal in the replacement file. Record the drain's actual receiving point and the hardware that permits access to the fan and duct.
Access must survive the work as a usable arrangement. Greenheck's manual requires reinstating the specified fasteners after a hinged base has been opened. Include the restored mounting condition in the closeout photos alongside the listing label, rather than documenting only the fan before it was opened.
The kitchen grease-duct guide follows the hood, duct, cleaning access, and grease containment as a connected system. The replacement fan's acceptance record should identify which of those interfaces the work disturbed.
Distinctions
- General ventilation listing
- A listing for ordinary ventilation does not establish the restaurant-exhaust application. Verify the application covered by the submitted fan's certification.
- Smoke-control fan
- Greenheck identifies smoke-control ventilator requirements under UL 705 Supplement SD. Supplement SC addresses restaurant exhaust; the supplements are not interchangeable.
Grease-exhaust crews expanding a territory use PorchRocket Asset Search to locate rooftop fans visible from above, with the owner of record on each reviewed find.
Frequently asked questions
Does an old UL 762 reference mean the fan must be replaced?
The legacy designation alone does not establish a defect in existing equipment. Identify the actual model, original listing, installed condition, and requirements governing the current work.
Sources checked
- Intertek: UL Subject 762 withdrawal and UL 705 transition, effective June 1, 2021
- Greenheck: current fan listing designations, UL 705 Supplements SC and SD
- UL Standards & Engagement: UL 705 active seventh edition, September 2024 revision
- Greenheck: CUE/CUBE installation manual 471560, restaurant-exhaust installation and hinged-base fastening
- NFPA: NFPA 96, current 2027 edition
Also defined as
- The rooftop grease exhaust fan that discharges up and away from the roof, hinged for cleaning