Field glossary · component
Backdraft damper
Select a backdraft damper at the fan's minimum operating flow, using its opening-pressure and forward-loss data as well as its reverse-leakage rating. Greenheck's gravity-operated BD-100 starts opening around 0.01 in. w.g.; that number does not establish a fully open blade. Mounting orientation also belongs in the selection because blade weight supplies the closing force on this model.
A flap that closes when the fan is off to stop outside air from flowing back down the exhaust
Start-open pressure is not the full-open pressure
Greenheck's backdraft-damper catalog lists 0.01 in. w.g. as the BD-100's start-open pressure and explains that the blades are only beginning to rotate at that point. Size and bearing selection affect that value. Use the pressure-drop curve at the required flow to account for the resistance of the operating damper.
A low-speed exhaust setting is the revealing condition. Record fan speed, forward pressure across the damper and measured airflow together. A blade that floats partly open at minimum speed can add enough resistance to shift the fan's operating point, even though it opens freely at full speed. Blade flutter also deserves a check against the selected mounting and flow direction.
Read the mounting and leakage data together
Greenheck's December 2025 BD-100 submittal specifies horizontal mounting with vertical upward airflow, a maximum velocity of 1,500 fpm and a maximum differential pressure of 2.0 in. w.g. Turning the assembly into a different orientation changes the gravity action on which its closure depends.
The same Greenheck submittal rates BD-100 closed leakage at no more than 39 cfm per square foot at 1.0 in. w.g. That is a stated test condition, rather than a promise of an airtight closure. Keep damper area and reverse differential with a leakage estimate instead of transferring that rating unchanged to every wind condition.
Inspect the frame before changing the counterweight
A frame installed out of square can bind a blade that moved freely before installation. Inspect corner squareness, fastener projection and seal contact, then compare motion before and after the frame is secured. On a fan array, correlate that mechanical check with the failed-fan isolation test so the record distinguishes an installation defect from a fan-staging problem.
Distinctions
- Fire or smoke damper
- A backdraft rating establishes airflow-direction performance. It does not establish the fire-resistance or smoke-control listing of a life-safety damper.
Field example
For an 18 by 18 in. damper face, area is 2.25 ft². Applying the BD-100's 39 cfm/ft² published maximum gives about 88 cfm of reverse leakage at 1.0 in. w.g. The estimate uses damper face area and the stated test pressure; the forward-flow selection still uses Greenheck's separate pressure-drop curve.
Frequently asked questions
Why does the damper stay partly closed at low fan speed?
The available forward pressure is acting against blade weight, springs, bearings and seals. Compare the measured condition with the model curve, then correct binding or an unsuitable selection.
Sources checked
Also defined as
- A damper on each fan that closes when it stops, sealing off the idle or failed fan