ANVILFIELD Try FieldOS

Field glossary · equipment

Type II hood

Select a Type II hood for an appliance’s heat and moisture duty only when its cooking process produces neither grease nor smoke. Then distinguish dry-heat construction from condensate collection: materials, gutters, drains and baffles can change within one hood family. Published airflow belongs to the selected model and duty. Hood length alone does not establish the code-required net exhaust or the room’s replacement-air quantity.

A heat-and-steam hood with no grease, over dishwashers or steam kettles, with no grease duct

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Check the emissions and the net-exhaust definition

The 2024 International Mechanical Code, Section 507.3, identifies the Type II application boundary by the absence of cooking grease and smoke. ICC now publishes the 2027 IMC; the edition adopted for the permit determines the project requirement. Keep the appliance model and process on the hood schedule so a later equipment substitution triggers a category review.

The 2024 IMC Section 507.3.4 defines net hood exhaust as total exhaust minus air supplied directly into the hood cavity. A 900 cfm exhaust with 150 cfm injected into that cavity provides 750 cfm net. Makeup air delivered to the room is a separate air-balance quantity. Record the discharge location of replacement air before comparing a fan reading with the required net capture flow.

Condensate duty changes the hood construction

CaptiveAire specifies Type 304 stainless steel for exposed surfaces of its VHB hood in condensate applications, while Type 430 is available for heat applications. That distinction follows the actual moisture duty. Record it on the submittal instead of accepting “stainless Type II” as a complete material description.

The VHB condensate arrangement includes a four-sided perimeter gutter and one drain as standard. Check that the drain is present, accessible and connected to the approved receiving arrangement. Water collecting in the gutter with no effective discharge eventually returns to the equipment or floor below.

CaptiveAire also offers removable condensation baffles for heavier condensate duty. Identify the supplied configuration during kitchen equipment installation so the cleaning access and handling space match the actual hood.

Use the selected model’s exhaust basis

CaptiveAire publishes VHB selection rates of 100 cfm per linear foot for light load and 150 cfm per linear foot for heavy load on wall and one-piece island configurations. These are the VHB catalog’s load categories. They do not turn a grease-producing heavy-duty cooking appliance into a Type II application or replace the adopted code’s exhaust calculation.

At those published rates, a 6 ft VHB hood represents 600 cfm for light load or 900 cfm for heavy load. CaptiveAire’s VHB page bases recommended exhaust-duct sizing on 800 fpm. Carry the selected airflow into the fan and replacement-air design; a hood length by itself does not establish the total ventilation balance.

Verify capture during the wet operating cycle

Run the appliance through the condition that creates its vapor plume, including opening and unloading where those actions are part of normal use. Observe escape at the hood edges, condensation on nearby ceilings and drips outside the collection path. A dry, idle appliance does not reproduce the moisture load that the hood was selected to capture.

Record measured exhaust, direct cavity supply if present, room makeup air and appliance operating condition on the same test sheet. Include that sheet in the makeup-air balance and link the appliance schedule to the kitchen exhaust record. This makes a change in cooking duty visible during later service.

Distinctions

Type I hood
Grease or smoke from cooking changes the selection boundary. A Type II canopy’s stainless finish, physical size or catalog “heavy load” label does not establish that it satisfies Type I requirements.

Frequently asked questions

Why does a dishwasher hood drip after the fan starts?

Follow where condensation forms and where the gutter drains. A blocked collection path, missing drainage or vapor escaping capture can each deliver water below the hood; fan operation alone does not distinguish them.

Sources checked

Where this shows up

Related guides

Next step: Find kitchen ventilation projects

Back to the full field glossary