Field glossary · measurement
CFM
Report CFM, cubic feet per minute, with its measurement location and actual or standard-air basis. NIST converts 1 CFM to about 0.471947 L/s, but that unit conversion leaves the gas conditions unchanged. TSI's mass-flow meters reference 70°F and 14.7 psia; hotter or lower-pressure air occupies more actual CFM for the same mass. Keep the reference conditions with the number when comparing instruments.
The pump's displacement, how fast it moves gas; sets pull-down speed, not the depth it can reach
Actual CFM and standard CFM
TSI's FLOW-004 application note defines its flowmeter standard conditions as 70°F and 14.7 psia. Standard flow expresses the volume that the measured gas mass would occupy at those reference conditions. Actual CFM expresses the volume occupied at the measurement location.
TSI calculates actual volumetric flow from standard flow by multiplying by actual absolute temperature divided by reference absolute temperature, then by reference absolute pressure divided by actual absolute pressure. Gauge pressure and Fahrenheit temperature cannot be inserted directly into that gas-law ratio.
Identify the meter setting before comparing a traverse, a flow sensor and a compressor rating. Put the actual-or-standard setting beside each flow in the air-balance report, so outlet and main-duct totals are compared on the same basis.
A density correction with a visible consequence
Using TSI's reference of 21.11°C and 101.3 kPa absolute, 1,000 standard CFM at an actual 35°C and 84 kPa occupies about 1,263 actual CFM: 1,000 x (308.15 / 294.26) x (101.3 / 84). The larger actual volume carries the original mass flow; it does not represent 26% more air mass.
This matters when checking a hot exhaust stream or equipment at elevation. A volumetric sensor and a mass-based meter can both be correct while showing different numbers. Record actual temperature, absolute pressure and the configured reference alongside the reading before attributing the difference to leakage.
TSI's PANDA manual also expresses the conversion as actual CFM = standard CFM x 0.075 / density, with density in lb/ft³ for that reference. Use the density basis specified by the instrument instead of silently applying the same standard condition to every manufacturer's meter.
Converting units without changing conditions
NIST SP 811 gives one cubic foot per minute as 0.0004719474 cubic meter per second, or approximately 0.471947 liter per second. Multiplying CFM by that factor changes units only. It does not normalize temperature, pressure or humidity.
A report should distinguish a measured flow from a nameplate displacement. A vacuum pump's displacement describes its rated volumetric capacity; the connected hose and system pressure affect gas removal at the equipment. Likewise, compressor free-air delivery and compressed volume inside a line need their stated pressure bases to be compared.
Distinctions
- FPM
- Feet per minute measures velocity. CFM measures volume per time; converting requires the appropriate flow area and velocity distribution.
Frequently asked questions
Is SCFM always referenced to the same temperature?
No. TSI explicitly notes that other manufacturers use different reference values. Retain the actual reference temperature and pressure with the SCFM figure.
Does 1,000 CFM mean 1,000 cubic feet of fresh air?
Only if the measurement boundary is the outdoor-air stream. Total supply flow also includes recirculated air in a mixed-air system.
Sources checked
Also defined as
- Concrete: Cubic feet per minute of airflow; Table 1 ties grinder and tuckpointing collectors to 25 cfm or more per inch of wheel diameter
- Landscaping: Cubic feet per minute, the volume of air a compressor delivers, which is what moves the water out of the lines