ANVILFIELD Try FieldOS

Field glossary · measurement

CFM per ton

Calculate CFM per ton using coil airflow and an explicitly named capacity basis. A nominal three-ton system at 1,080 CFM runs at 360 CFM per nominal ton; if measured output is 30,000 Btu/h, the same airflow is 432 CFM per delivered ton. ICP's EMA coil instructions give 350 to 450 CFM per nominal ton for that application. Compare settings with the equipment's stated basis and operating stage.

Cooling airflow per 12,000 Btu/h of capacity, commonly 350 to 400

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Which tons are in the denominator?

Carrier describes approximately 400 CFM per ton as a common reference target, while its guidance says the proper airflow depends on the equipment and application. International Comfort Products installation instruction 484 01 3200 04 gives a general 350-to-450 CFM-per-ton range for its EMA manufactured-housing coil application. Neither statement turns nominal tonnage into measured cooling output.

A three-ton nominal system moving 1,080 CFM has 360 CFM per nominal ton. If its delivered total cooling at the test conditions is 30,000 Btu/h, that output is 2.5 refrigeration tons and the same flow is 432 CFM per delivered ton. The fan did not change speed. Only the denominator changed.

In a coil diagnostic record, retain the nominal ratio for instructions stated on that basis and label a heat-balance ratio as CFM per delivered ton. Keep both underlying airflow and Btu/h readings.

Use coil airflow, not an outlet subtotal

Air passing through the evaporator is the numerator. A sum of supply-register readings downstream of duct leakage, a bypass or an unmeasured branch describes a different boundary. That subtotal understates coil airflow when conditioned air escapes before reaching the measured outlets.

ICP's cited instructions provide separate dry-coil and wet-coil pressure-drop values at the same airflow. A wet-coil reading interpreted with the dry-coil table can therefore produce the wrong CFM estimate before tonnage enters the arithmetic. Identify coil condition and use the matching table or another measured airflow method.

For staged equipment, record the actual compressor and blower operating stage. A reduced compressor stage does not necessarily receive airflow proportional to the cabinet's nominal tonnage. Use its scheduled airflow rather than dividing every operating mode by the full-load label.

Turning a ratio into a commissioning record

DOE's Process Cooling System Cheat Sheet defines one refrigeration ton as 12,000 Btu/h. Preserve the underlying capacity in Btu/h, the actual airflow, the resulting ratio and the applicable manufacturer setting. That short calculation exposes a nominal-versus-delivered mismatch immediately.

A ratio above the selected target does not identify the cause by itself. High airflow, a reduced operating stage and a depressed delivered capacity all raise a capacity-derived ratio. A low value can reflect actual restriction or an airflow measurement taken after a loss. Resolve the numerator and denominator independently before changing the blower.

Distinctions

Cooling-tower ton
A separate heat-rejection convention; DOE lists it as 15,000 Btu/h. Do not use it as the denominator for evaporator airflow.

Frequently asked questions

Can a reasonable CFM-per-ton value prove the charge is correct?

No. The ratio describes airflow relative to a chosen capacity. Refrigerant condition and delivered sensible and latent performance require their own measurements.

Should outdoor ventilation CFM be divided by cooling tons?

Outdoor-air flow is only part of total evaporator airflow on a mixed-air unit. Keep the ventilation calculation separate from the coil airflow setting.

Sources checked

Also defined as

  • Airflow divided by the selected cooling capacity in nominal tons

Where this shows up

Related guides

Next step: See packaged-unit building lists

Back to the full field glossary