In psychrometric work, report specific enthalpy on a dry-air mass basis with the property method identified. Vaisala's DM500 equation gives 40.53 kJ/kg of dry air at 25°C and 6 g/kg moisture ratio, compared with 50.65 kJ/kg at 20°C and 12 g/kg. The cooler sample therefore carries more energy per kilogram of dry air. Temperature alone cannot establish an economizer's lower-enthalpy airstream.

Total heat of the air, sensible plus latent, in Btu per pound, used by enthalpy changeover to account for humidity

Used across 4 Anvilfield field guides, most in HVAC.
Updated

The dry-air basis stays in the denominator

Vaisala's DM500 user guide, revision M210205EN-D, calculates moist-air enthalpy as h = T × (1.01 + 0.00189x) + 2.5x, with T in °C, moisture ratio x in grams per kilogram of dry air and h in kJ/kg of dry air.

Enter 10 for a moisture ratio of 10 g/kg, not 0.010. The latter is the numerical value in kilograms per kilogram and belongs in a differently scaled equation. Likewise, a grains-per-pound reading must be converted before it is inserted. Copy the equation's unit definitions with its coefficients.

Audit an enthalpy value read from a psychrometric chart by recalculating it from the same temperature, moisture ratio and pressure basis. Retain the entered moisture unit with the result.

A cooler air sample with a higher enthalpy

Using Vaisala's equation, air at 25°C and 6 g/kg has an enthalpy of 40.53 kJ/kg of dry air. Air at 20°C and 12 g/kg has 50.65 kJ/kg. The second sample is 5°C cooler but carries 10.12 kJ/kg more energy on the same reference basis.

At 25°C, Vaisala's formula gives an enthalpy increase of approximately 2.55 kJ/kg of dry air for each additional 1 g/kg of moisture. That calculated sensitivity explains why a moisture-input error matters even when the temperature channel agrees closely with a reference thermometer.

Retain the measured humidity quantity and pressure used to derive moisture ratio. Relative humidity is not interchangeable with g/kg. A sensor reporting 50% RH has not supplied x = 50, and a percentage change in RH is not the same percentage change in enthalpy.

Keep the reference state and sampling boundary

Enthalpy tables assign a zero point; an isolated enthalpy number is incomplete without the fluid, units and reference convention. Subtract entering and leaving values calculated by the same method. Do not mix a chart value with an instrument value until their reference bases are aligned.

Sampling locations also determine what the difference includes. Trane's TRACE 3D Plus psychrometric example places the coil leaving air at 52.9°F to achieve 55°F supply air after 2.1°F of downstream fan heat. A measurement after that fan includes its sensible heat gain and therefore shows less net cooling than a measurement immediately after the coil.

An energy-recovery calculation needs the same discipline: identify each inlet and outlet stream and use one consistent enthalpy basis. A label such as supply air does not distinguish the wheel outlet from a point downstream of a cooling coil, heater or fan.

Distinctions

Heat rate
Energy transferred per time, such as kW. Specific enthalpy is energy per mass; multiply its change by dry-air mass flow to obtain a rate.

Frequently asked questions

Is enthalpy always positive?

No. Its sign depends on the selected reference state. A negative tabulated value does not mean the air contains negative absolute energy.

Why do two psychrometric tools disagree?

Compare pressure, temperature, moisture input, units and reference state first. Then compare the property equations and rounding used by each tool.

Sources checked