ANVILFIELD Try FieldOS

Field glossary · method

FDD

FDD means fault detection and diagnostics: software that compares equipment measurements with expected behavior and identifies operating faults. A useful FDD result includes the affected equipment, the operating condition that enabled the test, and evidence supporting the diagnosis. An alarm generated while a unit is starting, changing modes, or receiving a manual override needs different treatment from a fault that persists during stable operation.

Fault detection and diagnostics, the automated monitoring that reports economizer faults a person cannot see

Used across 3 Anvilfield field guides, most in HVAC.
Updated

Which economizers require FDD in California?

California's 2025 Energy Code, Section 120.2(i), requires economizer FDD on newly installed air handlers with mechanical cooling capacity over 33,000 Btu/h and an installed air economizer. Record the rated cooling capacity, economizer configuration, and governing code year on the acceptance sheet; an older submittal template can carry a different capacity trigger.

Section 120.2(i)2 of the 2025 California Energy Code requires temperature sensor accuracy of ±2°F from 40°F through 80°F. Two sensors at opposite ends of that permitted error can introduce a 4°F error into their temperature difference. Compare each installed sensor with a suitable reference before interpreting a small outdoor-to-return temperature split as a damper fault.

Certification is separate from a working alarm path

California's 2025 Energy Code exempts FDD algorithms based in direct digital control systems from Commission certification under Section 120.2(i)8, while retaining the operating requirements in paragraphs 1 through 7. A controls submittal claiming that exception still needs working sensors, status indications, test initiation, fault detection, and annunciation.

Section 120.2(i)6 of the 2025 California Energy Code permits reporting through a regularly monitored energy-management system, local annunciation meeting its location and instruction requirements, or an application that automatically notifies a remote HVAC service provider. Trace the approved route from a controlled fault simulation to the receiving person or device, then confirm clearing. Retain synchronized input trends and event timestamps with the response assignments in the building automation FDD record.

Distinguish an equipment fault from a bad diagnostic

A return sensor biased warm can make outdoor air look favorable even when an economizer should be locked out. Before replacing a damper actuator, compare the temperatures used by the algorithm with independent readings and inspect the commanded operating mode. The diagnostic is a reason to investigate that causal chain, not proof that its named component has failed.

Track recurring alarms by equipment and enabling condition. Ten alerts from one sustained fault are one unresolved event for repair planning. Closing each notification independently inflates the apparent repair count and hides the duration of the operating problem.

Distinctions

Alarm limit
A limit alarm reports a threshold crossing; diagnostic logic combines evidence to identify a likely operating fault.

Frequently asked questions

Does a cleared FDD alarm prove the repair worked?

Only if the equipment re-enters the condition that originally enabled the test. A fault disappearing when cooling shuts off does not demonstrate successful economizer operation.

Sources checked

Also defined as

  • Fault detection and diagnostics, software that reads BAS trend data to find faults and name the likely cause
  • Fault detection and diagnostics, analytics on BAS data that surface faults like a stuck economizer

Where this shows up

Related guides

Next step: Build an RTU list

Back to the full field glossary