Field glossary · process
Simultaneous heating and cooling
Simultaneous heating and cooling can represent humidity control, heat recovery between zones, or an actual control fault. The diagnostic question is whether the added heat has a current purpose in the approved sequence. Separate overlapping commands from measured heat transfer: a valve commanded closed can still leak, while active hot-gas reheat can temper dehumidified air using heat that the refrigeration system would otherwise reject.
One system heating air another system just cooled, a classic and costly waste FDD targets
When cooling and reheat have a legitimate purpose
A cooling coil removes moisture by bringing air below its dew point. Reheat then raises the dry-bulb temperature without replacing that removed moisture. That sequence addresses a latent load that the room thermostat alone cannot represent. A wet outdoor-air day with little room sensible load is the case that exposes the difference.
Trane’s Engineers Newsletter 52-2, Using Hot Gas Reheat for Humidity Control, describes routing hot refrigerant through a reheat coil downstream of the cooling coil. Mark whether reheating uses that recovered heat, hot water or electric resistance. This identifies the heat source and purchased-heating demand; compressor and fan electricity still belong in the operating comparison.
The deadband requirement has a stated scope
California’s 2025 Building Energy Efficiency Standards, Section 120.2(b)3, require the covered controls serving both comfort heating and comfort cooling to support a deadband of at least 5°F, with conditioning off or at minimum inside it. CEC exempts thermostats requiring manual mode changeover and systems serving healthcare facilities from this provision. Setpoints of 70°F for heating and 75°F for cooling provide that separation; the clause is a thermostat capability requirement, not a ban on every reheat operation.
The same 2025 California standards define reheat as warming air previously cooled mechanically or supplied by an economizer. The definition follows the airstream, not whether the refrigeration compressor happens to be running. That matters when an FDD rule checks compressor status but misses heating that is cancelling excessive economizer cooling.
Prove unwanted heating from temperatures
Trend the zone temperature and setpoints, airflow, air temperature entering and leaving the heating coil, heating command and dehumidification mode together. A heating command of zero with a repeatable temperature rise across the coil under steady airflow points toward heat transfer that the command does not explain.
Air entering an inactive reheat coil at 56°F and leaving at 64°F has an 8°F rise. First compare the two sensors together at a common temperature, then examine the rise at steady airflow and the valve’s actual response. Locate the probes across the coil so fan heat is not attributed to the valve. Attach that evidence to the FDD incident and include the humidity-control mode in the trend.
Distinctions
- Heat recovery between zones
- A system can move heat from a cooling zone to a heating zone. Opposite zone loads do not by themselves demonstrate same-zone waste.
Frequently asked questions
Should an alarm ignore every humidity-control event?
No. Confirm the humidity demand, recovered-heat operation and reheat limit. A valid dehumidification mode does not justify a leaking valve after that mode ends.
Sources checked
Also defined as
- The building heating and cooling the same air or adjacent zones at once, paying twice