DCV
California's 2025 rules give CO2-based demand-controlled ventilation, or DCV, two control bases: a fixed indoor ceiling of 1,000 ppm using assumed 400 ppm outdoors, or measured outdoor CO2 plus 600 ppm. The allowed reduction in ventilation retains the occupied airflow floor. Put the selected basis, sensor location, design-airflow cap and failure response in the acceptance record; a correct setpoint alone does not establish a compliant sequence.
Demand-control ventilation, modulating outside air to actual occupancy, commonly using CO2 as the occupancy proxy
When California requires DCV
California's 2025 Section 120.1(d)3 triggers DCV at a design occupant density or code egress occupant load of at least 25 people per 1,000 ft² when the serving system has an economizer, modulating outdoor-air control or design outdoor airflow above 3,000 cfm. A dense room alone does not establish the complete trigger.
The section exempts rooms below 150 ft² or designed for fewer than 10 occupants, and spaces where exhaust exceeds design ventilation minus 0.2 cfm/ft² of conditioned area. It prohibits DCV for the listed contaminant-generating processes without local exhaust, including unvented food preparation and science labs. Resolve those exceptions before carrying a sensor quantity into the estimate.
Use the setpoint required by the identified code
California's 2025 Building Energy Efficiency Standards, Section 120.1(d)4, require covered DCV controls to hold indoor CO2 at no more than 600 ppm above outdoor concentration, subject to the section's design-airflow limit. This is a California control requirement, not a universal indoor-air-quality threshold.
California's 2025 Section 120.1(d)4D permits either assumed outdoor CO2 of 400 ppm or dynamic measurement within 4 ft of the outdoor-air intake. The CEC acceptance reference consequently checks a fixed indoor setpoint no higher than 1,000 ppm, or a dynamically reset setpoint no higher than measured outdoor plus 600 ppm. Keep the selected basis with the BAS point definition.
Place sensors where the controlled population is represented
California's 2025 Section 120.1(d)4 requires sensors in covered rooms at a density of at least one per 10,000 square feet and between 3 and 6 feet above the floor or at occupants' anticipated head height. A return-air average from several rooms does not establish the required room-level installation.
The same section requires an increase in ventilation when any sensor in a multisensor zone indicates CO2 near or at setpoint. Averaging away the highest occupied-room reading changes that decision rule. Preserve individual sensor identities and the selection logic when integrating the points into the DDC controls system.
Keep the economizer from masking the acceptance test
CEC's 2025 acceptance-test quick reference calls for locking out economizer control during DCV testing because another ventilation command can control the damper. Verify rising demand, falling demand and the occupied minimum with DCV actually in command. Restore normal control afterward and retain the accepted minimum and design airflow limits with the test record.
Test the occupied airflow and sensor-failure states
California's 2025 Section 120.1(d)4E retains area airflow Ra x Az in each CO2-controlled space; for other served spaces, it adds the larger of their exhaust duty or Section 120.1(c)3 ventilation. Section 120.1(d)4F restores the affected zone's Section 120.1(c)3 design ventilation during occupied hours when sensor failure is detected. A failed sensor therefore needs a distinct response from a valid low-CO2 reading.
Add both conditions to the acceptance record: measured occupied minimum with a valid low reading, then the design-ventilation response to a simulated sensor fault. Log airflow and control state together so an alarm alone is not mistaken for successful fallback.
Distinctions
- CO2 as an air-quality score
- Occupant CO2 is one demand signal. It does not measure particles, cleaning-product emissions or every contaminant that determines indoor air quality.
Field example
With dynamically measured outdoor CO2 at 450 ppm, the cited California differential produces an indoor control ceiling of 1,050 ppm. A sensor reading 1,080 ppm exceeds it by 30 ppm. The system must respond within its specified design-airflow limit; a damper already held open by an economizer would not prove the DCV response.
Frequently asked questions
Can the occupied ventilation minimum disappear when CO2 falls?
CEC acceptance criteria require an occupied minimum regardless of space CO2. Confirm that airflow condition separately from the concentration setpoint and damper modulation.
Sources checked
Also defined as
- Demand-controlled ventilation, which adjusts outdoor air to occupancy, often by CO2 sensing
- Demand-controlled ventilation, modulating outdoor air to occupancy, usually by CO2