ANVILFIELD Try FieldOS

Field glossary · component

VAV box

A VAV box meters primary air to a zone; its displayed cfm is calculated from a particular sensor, inlet arrangement and controller conversion. A stable airflow reading can therefore conceal the wrong calibration. Record the terminal model, nominal inlet size, actual sensor location and coefficient definition before changing the airflow setup. Reheat and fan options also change the equipment and access that must be identified above the ceiling.

Variable air volume terminal unit; a controlled damper, flow sensor, and optional reheat that conditions one zone

Used across 3 Anvilfield field guides, most in HVAC.
Updated

Match the sensor table to its location

Titus’s AeroCross manual assigns an inlet K-factor of 904 cfm to unit size 08, excluding QCV applications. Its dual-duct discharge table assigns 997 cfm to unit size 08, with a size 09 sensor. The matching unit-size label does not mean the sensor dimensions or calibration are the same. Read the unit-size, sensor-size and application columns together.

Titus defines its cfm K-factor as the airflow producing 1.0 in. wg differential at the pickup, and calculates Q = K × √ΔP. At 0.0625 in. wg, K = 904 produces 226 cfm; K = 997 produces 249.25 cfm. That is a 10.3 percent reporting increase from the table selection alone. Use the cfm column for this equation, not the adjacent fpm coefficient.

Nominal inlet size is not a caliper reading

Titus’s Single Duct Terminals IOM states that the inlet collar is made 1/8 inch smaller than the listed size so it fits inside the corresponding duct. A nominal 8 inch terminal can therefore have a 7-7/8 inch collar. That fit allowance is not a reason to select a different nominal sensor size.

Record the nameplate and model before entering a K-factor. Identify whether the controller uses a flow coefficient, velocity coefficient, inlet area or a manufacturer-specific scaled value. Copying a number between controllers with different parameter definitions produces an invalid conversion.

Provide the inlet geometry the sensor expects

Titus’s current single-duct instructions call for at least 1.5 inlet diameters of straight duct for optimum control accuracy. For an 8 inch inlet, that is 12 inches of straight duct. This is the cited manufacturer’s installation detail; keep the actual terminal instructions with the record.

An elbow tight to the pickup can distort the pressure field the sensor uses. Before changing a flow coefficient to force agreement at one operating point, document that inlet condition and inspect the pickup tubing. The VAV commissioning guide covers the functional sequence and measured airflow handoff.

Leave access to the parts that will need service

Photograph the actuator, controller, pickup connections and any reheat access before ceiling closure. Identify the room or access panel from which each is reached. A ceiling label that identifies the box but leaves the control cover above fixed construction does not deliver a maintainable terminal. Coordinate this with the air-balance report.

Distinctions

Zone damper
A damper that directs or restricts air. It is not automatically a complete VAV terminal with the sensor and control arrangement described here.

Frequently asked questions

Can the same K-factor be copied to every 8 inch box?

Only when terminal model, inlet or discharge application, sensor size and controller units match. The Titus size-08 inlet and size-08 dual-duct discharge examples use different sensor sizes as well as different coefficients; an “08” label alone is insufficient.

Why does the box report perfect airflow while the room is short?

A wrong conversion can produce a stable but incorrect displayed flow. Also distinguish flow through the terminal from air arriving at the outlets after downstream leakage.

Sources checked

Also defined as

  • Terminal unit at each zone with a damper, controller, airflow sensor, and optional reheat coil
  • A commercial variable air volume terminal that throttles air to a zone, often with reheat

Where this shows up

Related guides

Next step: Track VAV replacement bids

Back to the full field glossary