ANVILFIELD Try FieldOS

Field glossary · measurement

K-factor

Electrical K-factor describes harmonic eddy-current heating, with each harmonic current weighted by the square of its order. An 80 A fundamental plus 60 A of third harmonic produces a different result from the same amperes of fifth harmonic, despite identical RMS current and THD. Identify the current base and distinguish a measured load factor from a transformer K-rating. Sprinkler and VAV K-factors belong to different physical calculations.

A transformer's rating for handling harmonic heating, from K-1 to K-50 under UL 1561

Used across 4 Anvilfield field guides, most in Electrical.
Updated

Why equal THD does not mean equal harmonic heating

Hammond Power Solutions expresses its rated-current calculation as K = sum of [(Ih / Irated) squared times h squared], including the fundamental at h = 1. Schneider Electric's PM8000 calculation instead normalizes the weighted sum to the measured RMS current. Those bases coincide at rated load; a meter K reading and a rated-current calculation need their denominators identified before comparison.

With an 80 A fundamental and a 60 A harmonic component, RMS current is the square root of 80 squared plus 60 squared, or 100 A. Current THD is 60/80 = 75 percent. On a 100 A rated-current base, the third-harmonic weighting gives K = 0.8 squared + 9 times 0.6 squared = 3.88; fifth-harmonic weighting gives 9.64.

Spectrum on a 100 A rated-current baseRMS currentCurrent THDCalculated K
80 A fundamental plus 60 A third harmonic100 A75%3.88
80 A fundamental plus 60 A fifth harmonic100 A75%9.64

Match a marked K-rating to the load calculation

Hammond Power Solutions states that a K-rated transformer carries its full rated load when the load K-factor does not exceed the transformer's K-rating. On the same rated-current basis, the 3.88 load above fits K-4, while the 9.64 load calls for the next suitable offered rating, such as K-13. These numbers describe heating capability rather than harmonic removal.

Hammond distinguishes the more robust K-rated design from harmonic-mitigating transformer arrangements that cancel selected harmonic effects. A cooler transformer case after replacement does not establish that the upstream harmonic current has fallen. Keep the harmonic mitigation study responsible for the actual distortion objective.

Use IEEE C57.110 for an existing transformer loading decision

IEEE C57.110-2018 remains the active recommended practice for evaluating transformer capability with nonsinusoidal load currents. Its scope includes assessing existing dry-type and liquid-immersed units and specifying new units for these loads. The calculation uses the transformer's loss characteristics as well as the load spectrum; a field reading of K alone is not an existing unit's new kVA nameplate.

Halving both currents in the third-harmonic example gives 40 A fundamental, 30 A third harmonic, and 50 A RMS. The PM8000's measured-current normalization still gives 3.88, while Hammond's formula on the same 100 A rated base gives 0.97. That lower rated-base result describes lower current loading, not a newly cleaner waveform. Save harmonic amperes and loading fraction with the K result.

Distinctions

Sprinkler K-factor
A dimensionless transformer K-rating cannot replace the coefficient in a sprinkler hydraulic calculation; the latter carries the flow-and-pressure unit convention of that calculation.
VAV K-factor
A VAV commissioning sheet pairs K with a particular airflow sensor and box size. Its number cannot be compared with the harmonic heating designation on a transformer schedule.

Frequently asked questions

Does K-13 mean 13 percent harmonics?

K-rating is a weighted heating designation. It is not a THD percentage, and equal THD values can produce different K-factors.

Does a K-rated transformer filter harmonics?

Its K-rating establishes thermal capability. Select and verify harmonic mitigation separately from that heating rating.

Sources checked

Also defined as

  • HVAC: The manufacturer's calibration constant that converts the inlet sensor's velocity pressure to airflow for that box size
  • Plumbing: A sprinkler's flow coefficient; flow equals K times the square root of pressure, so a larger K passes more water

Where this shows up

Next step: Find transformer upgrade bids

Back to the full field glossary