Field glossary · process
DGA
Transformer DGA, or dissolved gas analysis, is a dated, gas-by-gas insulating-liquid test used to distinguish a stable gas inventory from a changing condition. The report needs the liquid type, sample point, analytical method, and sampling date beside its concentrations. A methane increase of 30 ppm means something different over 30 days than over 300 days. Keep the individual gases and elapsed time available instead of reducing the result to an oil-test pass label.
Dissolved gas analysis, identifying internal faults from gases dissolved in transformer oil
Keep the sampling standard separate from the laboratory method
ASTM D3612-02(2026) covers three procedures for extracting and measuring dissolved gases by gas chromatography in insulating oil with viscosity no greater than 20 cSt at 40 C. It identifies the analytical method. ASTM D923-15(2023) addresses sampling insulating liquids, including glass syringes and stainless steel cylinders used for DGA and water analysis.
Put both method identifiers on the laboratory order and retain the sample point. Changes in sampling equipment, trapped air, fluid replacement, and oil processing affect whether successive results describe the same operating condition. Retain the acceptance-test baseline, including its laboratory method and sample location, so later measurements can be compared with the same starting condition.
Calculate the concentration trend from the sampling dates
ASTM D3612 explicitly identifies gas-generation rate and changes in individual gas concentrations as information used to evaluate equipment condition. A methane result rising from 25 ppm to 55 ppm in 30 days increases at 1 ppm per day over that interval. The same 30 ppm increase over 300 days is 0.1 ppm per day. Preserve the dates rather than presenting both cases as the same increase.
Use the collection dates for that denominator, not the dates the laboratory released its reports. Record each gas concentration alongside its calculated rate; a combustible-gas total can conceal which component is changing. Place load changes, temperature excursions, switching events, and oil treatment on the same timeline. A concentration trend describes the net change in the sampled oil, including the effect of any treatment or fluid replacement.
Use the interpretation guide for the actual insulating liquid
IEEE C57.104-2019 is the active interpretation guide for in-service mineral oil-immersed transformers. That scope matters: identifying the liquid is part of selecting the interpretation framework, rather than treating every insulating fluid as mineral oil. Keep the laboratory's detection limits and any below-detection notation with the gas results.
A receiving baseline need not contain zero gas. Preserve the measured values and the factory or receiving history instead of replacing the first result with an assumed zero. After degassing or an oil change, mark that event explicitly; a lower concentration after treatment does not by itself establish that the underlying gas-producing condition has ended.
Distinctions
- Dielectric breakdown test
- An oil report containing only a breakdown voltage cannot provide the individual gas concentrations or dated trend needed for DGA interpretation. Order the gas analysis explicitly when those are the deliverables.
- Dense-graded aggregate
- Paving crews also use DGA for dense-graded aggregate. That material abbreviation has no connection to transformer laboratory testing.
Frequently asked questions
Is a combustible-gas total enough to diagnose a transformer?
Retain the individual gases, their trends, the liquid type, and operating events. The total compresses information needed to distinguish the gas-producing conditions.
Does a lower DGA result after oil processing prove the fault is gone?
Oil processing changes the gas inventory. Establish the post-treatment trend and retain the treatment date with the previous results.
Sources checked
Also defined as
- Datacenter: Dissolved gas analysis, the fault gases dissolved in the oil, interpreted under IEEE C57.104
- Dissolved gas analysis, the oil test that reads internal faults in a liquid-filled unit