Separately derived system

A separately derived system is a source other than a service whose circuit conductors are electrically separate from other sources, except for grounding and bonding connections. A UPS nameplate cannot establish that classification: an output isolation transformer and a maintenance bypass carrying a common neutral present different circuit relationships. Trace the actual output, neutral, and bypass paths in each operating mode while retaining the common equipment-bonding network.

A source, such as a generator behind a switched-neutral transfer switch, that needs its own single neutral-to-ground bond per NEC 250.30

Used across 4 Anvilfield field guides, most in Electrical.
Updated

Classify the source in every permitted operating mode

A one-line can conceal a neutral or maintenance-bypass connection that matters to source classification. Expand the circuit far enough to see normal operation, alternate-source operation, and each bypass position. A transformer symbol establishes magnetic coupling only when the actual connection uses isolated windings; an autotransformer retains a conductive winding connection.

Cummins T-011 describes a three-wire UPS input arrangement with an isolated output supplying its own neutral, and a maintenance-bypass arrangement that carries a source neutral through to single-phase loads. List those paths separately on the review drawing. The transformer construction guide helps identify the winding arrangement; the external bypass drawing establishes whether another circuit path remains.

Separate a common bonding network from a common neutral

ASCO's solid-neutral configuration connects the normal-source neutral, alternate-source neutral, and load neutral through a plate. That is a circuit-conductor connection, even when the phase contacts connect only one source at a time. Equipment frames connected through their protective bonding network describe a different relationship.

An ohmmeter reading through installed bonding jumpers can therefore be misleading if it is treated as a winding-isolation test. Identify the complete path behind a continuity indication: circuit conductor, bonding jumper, enclosure, raceway, or electrode conductor. Preserve the source diagram and the test isolation conditions so the reported reading answers the intended question.

Grounded and separately derived describe different properties

Schneider Electric's System Grounding guide distinguishes solid, resistance, reactance, and ungrounded arrangements. It explains that a wye or delta winding configuration does not inherently establish a particular grounding arrangement. Source separation and system grounding must therefore appear as separate decisions in the design record.

Use two separate fields on the source schedule: circuit isolation and grounding method. An isolated delta winding can qualify as a distinct source without a neutral terminal, while a wye symbol alone does not show where its neutral is grounded. Record the actual winding and grounding connections together so a source classification cannot be mistaken for a complete installation detail.

NFPA identifies the current published National Electrical Code as the 2026 edition. Keep the adopted edition in the project record with the source classification and bonding detail. A current publication year and a jurisdiction's adopted installation rules are different fields on that record.

Distinctions

New voltage
An autotransformer can change voltage while retaining a direct circuit connection. Voltage conversion alone does not create a separate source.
Separate earth electrode
An earth connection describes grounding. Source classification follows the circuit conductors, including any shared neutral.

Frequently asked questions

Does a transformerless UPS automatically create a separately derived system?

Trace its actual output, neutral, and bypass connections. The product category alone does not establish separation.

Must separately derived systems have isolated equipment grounds?

Their equipment remains bonded into the protective grounding network. Circuit-conductor separation and equipment bonding serve different purposes.

Sources checked

Also defined as

  • A power source like a generator that feeds a panel or transfer switch, which changes where the neutral is bonded
  • A secondary with no direct connection to the supply, grounded on its own

Where this shows up

Related guides