ANVILFIELD Try FieldOS

Field glossary · safety

AEGCP

An AEGCP, or assured equipment grounding conductor program, controls the release of construction-site cords, temporary receptacles, and grounded cord-connected equipment through recorded grounding tests. Each passing item needs an identity and a current test record, including spares available to the crew. Ground-path continuity and correct grounding-terminal attachment are separate checks. A color band records a passing test period; damage or a repair creates a new release decision.

Assured equipment grounding conductor program, the written OSHA program that tests and records the ground path on temporary power equipment

Used across 2 Anvilfield field guides, most in Electrical.
Updated

Which equipment belongs on the AEGCP register?

OSHA’s 29 CFR 1926.404(b)(1)(iii) includes covered cord sets, nonpermanent receptacles, and cord-connected equipment that employees use or have available for use. A spare extension cord on the truck therefore belongs in the program when it remains available to the crew. Removing an item from service requires a real separation from usable stock, not merely an overdue date in a spreadsheet.

OSHA’s 29 CFR 1926.302(a)(1) permits approved double-insulated electric tools in place of grounded tools. That exception concerns the tool’s construction; it does not exempt a grounding-type extension cord supplying the tool. Record the cord and tool separately so the absence of a tool grounding pin does not obscure a broken conductor in the cord.

What the inspection exception actually excludes

OSHA’s 29 CFR 1926.404(b)(1)(iii)(C) exempts fixed cord sets and receptacles protected from damage from the daily visual-inspection requirement. A cord left in one position across a traffic route is not protected merely because nobody moved it. The exception names both the installation condition and protection from damage.

A useful inventory identifies the actual item, its grounding requirement, its location, and its release status. Keep those distinctions alongside the inspection and testing workflow in the AEGCP field guide. An inventory organized only by tool model cannot distinguish a repaired cord from an identical untested spare.

Put calendar dates on the next test

OSHA’s 29 CFR 1926.404(b)(1)(iii)(E) limits the ordinary retest interval to three months and permits six months for fixed cord sets and receptacles protected from damage. A movable cord passing on November 5, 2026 therefore reaches its calendar limit on February 5, 2027; qualifying fixed equipment tested that day reaches May 5, 2027.

A repair on November 9 interrupts that calendar: OSHA requires a new test before the repaired item returns to use. The same release control applies after an incident reasonably suspected of causing damage and before first use. Put the triggering event beside the next due date so the calendar cannot authorize equipment with an unresolved damage event.

How long must an AEGCP test record remain?

OSHA’s 29 CFR 1926.404(b)(1)(iii)(G) requires each test record to remain until a more current record replaces it. The rule permits logs, color coding, or another effective method and requires the record to identify equipment that passed and its last test date or interval.

A quarterly color applied to every cord at once loses its meaning if failed items receive the same mark. Tie the mark to the passing result and retain the current register at the jobsite. A repair creates a new testing event; the old passing record describes the equipment before that repair.

Distinctions

GFCI test
A GFCI function test checks operation of a protective device. It does not establish that every downstream cord has an intact equipment grounding conductor.

Frequently asked questions

Does OSHA specify a universal resistance limit for the AEGCP continuity test?

The cited AEGCP provision requires electrical continuity and correct grounding-terminal attachment; it does not prescribe a numerical ohm limit. Record the instrument, result, and acceptance method established by the program.

Sources checked

Where this shows up

Next step: Find electrical project bids

Back to the full field glossary