EGC

EGC means equipment grounding conductor: the conductive path that connects equipment’s exposed conductive parts into the grounding and bonding system. Its field verification must address the actual path, including joints and terminations. A green wire present in an enclosure is evidence of an intended connection; it does not establish continuity, low resistance, or the condition of the complete fault-return circuit.

Equipment grounding conductor; qualifying metal tray can serve this function under NEC 392.60, with the required identification, metal area and continuity

Used across 14 Anvilfield field guides, most in Electrical.
Updated

A continuity indication is only one part of the evidence

OSHA’s 29 CFR 1910.304(g)(5) requires the grounding path from circuits, equipment, and enclosures to be permanent, continuous, and effective. The requirement concerns the completed path, so a sound conductor with a loose or corroded termination can still leave the installation deficient.

Identify the intended path and its connections alongside the conductor selection in the EGC sizing guide. Record the points tested rather than writing “ground good” against the whole machine. A reading between two accessible surfaces does not necessarily identify which parallel metallic route carried the test current.

Remove test-lead resistance from a small-resistance measurement

Keithley’s Model 2110 Reference Manual identifies test-lead resistance as an error source in small-resistance measurements. In a two-wire setup, the same leads carry current and sense voltage, so the result includes the wiring and contact resistance along that path. Shorting the leads supplies a baseline; moving the probes to the installed connection still introduces contact conditions at those test points.

Keithley’s four-wire arrangement uses separate current and voltage-sensing pairs, improving low-resistance measurement by sensing voltage at the test object. Place the sense contacts within the current contacts as the instrument instructions show, on an isolated, deenergized object. Preserve the test current, test points, and lead arrangement with the reading so the result can be repeated.

A reading of 0.23 ohm with a two-wire setup whose shorted leads read 0.18 ohm leaves a nominal difference of 0.05 ohm. That arithmetic explains why lead resistance matters; it does not establish an installation acceptance threshold. A suitable low-resistance measurement resolves the connection more directly.

Distinguish conductor resistance from the full fault loop

The EGC is one part of the circuit that carries fault current back to the source. Source impedance, the energized conductor, connections, and the return path all affect that current. An individual bond measurement cannot by itself predict protective-device clearing.

Keep resistance measurements, visual connection findings, and the protective-device information together. Where a parallel raceway or structural path exists, document what remained connected during testing so a later reader can tell whether the measurement established the particular conductor path or only an available parallel route.

At 120 V, a total fault-loop impedance of 0.50 ohm permits about 240 A by Ohm’s law. That total includes the supply and outgoing path as well as the grounding return, so substituting the 0.05-ohm bond result above would falsely predict 2,400 A. Compare the complete loop result with the actual protective-device curve when determining clearing behavior.

Distinctions

GEC
An electrode-resistance test evaluates the earth connection. An EGC verification follows conductive equipment back toward its supply bonding point; a good earth-electrode result cannot establish that a loose machine bonding connection will carry fault current.

Frequently asked questions

Does an EGC have to be a separate insulated wire?

The permitted equipment grounding path can include qualifying metal wiring methods as well as a wire conductor. Identify the actual approved path and its bonding connections before choosing the inspection and measurement points.

Sources checked

Also defined as

  • Equipment grounding conductor, the fault path bonding equipment metal back to the source, sized from Table 250.122 by the overcurrent device
  • Equipment grounding conductor, a bonding conductor carrying fault current to trip the breaker, sized from the overcurrent device

Where this shows up