SDS
On an electrical drawing, SDS means separately derived system; a transformer secondary with isolated windings is a common example. The abbreviation is not a complete bonding detail. A 208Y/120 V secondary schedule still needs its source tag, neutral terminal, bonding location, and first disconnect identified. On a chemical submittal, SDS instead means safety data sheet. Expand the abbreviation in the document title so an electrical detail is not confused with a material-safety document.
Separately derived system, such as an isolation transformer, with its own grounding point near the load
Turn the abbreviation into a source detail
Start with two equipment tags, such as T1 for the transformer and DS1 for its first secondary disconnect with overcurrent protection. Draw the winding connection and label X0 where the source has a neutral. Then locate each bonding connection on that drawing. A takeoff line reading only "SDS grounding" conceals whether the installer needs a local jumper, a conductor between enclosures, an electrode connection, or all three.
Schneider Electric's grounding design guide identifies 480Y/277 V and 208Y/120 V as common solidly grounded wye arrangements. The neutral terminal supplies phase-to-neutral loads in those arrangements. The secondary voltage designation and winding symbol therefore convey information that a transformer box labeled only "SDS" omits.
Identify each conductor by both endpoints
For an indoor solidly grounded transformer detail with the system bond at T1, identify the X0-to-enclosure jumper separately from the bonding path between T1 and DS1. Schneider Electric's grounding design guide distinguishes the derived source's system bonding jumper from its grounding electrode conductor; naming both endpoints makes that distinction visible on a takeoff.
The conductor reaching the building electrode system has a different destination from the conductor joining the transformer and disconnect enclosures. Beyond DS1, identify the feeder equipment-grounding path separately. These labels establish which sizing rule the designer must apply; the letters SDS alone specify no conductor size, terminal capacity, or routing.
| Detail item | Endpoints in the T1/DS1 arrangement | What the estimator counts |
|---|---|---|
| System bonding jumper | T1 neutral terminal to its enclosure/bonding connection | Local connection, terminals, and specified jumper |
| Supply-side bonding path | T1 enclosure to DS1 enclosure with the secondary circuit | Specified bonding means along that route |
| Grounding electrode conductor | Derived-system grounding point to electrode system | Electrode route and termination |
| Feeder equipment-grounding path | DS1 toward downstream equipment enclosures | Feeder bonding means beyond the disconnect |
A grounding bar does not establish every required connection
Hammond Power Solutions' transformer FAQ places the grounding-and-bonding terminal bar on the enclosure, away from ventilation openings. HPS says its ventilated low-voltage transformers typically include grounding bars or lugs, while units without them provide for field-installed lugs. Count furnished terminals and field-supplied jumpers separately; a catalog statement about a bar does not document the completed neutral bond.
Use the grounding-electrode guide for the building connection, then make the turnover photos answer the T1/DS1 drawing. One view should identify the source terminal and local bond; another should show the outgoing conductor labels and destinations. A close photograph of a green screw cannot resolve which enclosure is DS1 or where its neutral continues.
Distinctions
- Isolated ground
- An IG designation on a receptacle schedule does not answer the SDS question at T1. Trace the source circuit and the specified equipment-grounding route as separate drawing details.
- Safety data sheet
- A chemical SDS describes a specific substance or mixture. It is a different document from an electrical source-and-bonding detail.
Frequently asked questions
What should an SDS note on a transformer drawing include?
Identify the source tag, secondary connection, bonding point, conductor functions, electrode connection, and first disconnect so the note leads to a complete detail.
Does continuity between two equipment ground bars mean they are one source?
Bonded equipment can share a grounding system while their circuit sources remain separately derived. Trace circuit conductors as well as equipment bonds.
Sources checked
Also defined as
- Datacenter: Separately derived system, the transformer secondary that is grounded once at the PDU
- Separately derived system, with no direct electrical connection to another system's circuit conductors