Field glossary · equipment
PDU
A floor power distribution unit (PDU) needs an interface specification as well as a kVA rating: Eaton's PowerPak, for example, has a three-phase, three-wire input and a three-phase, four-wire output, each plus ground. Rack strips also use the PDU name but have a different connection and service scope. For a transformer-equipped floor unit, the installed taps, ambient rating and monitoring options determine the acceptance checks.
Power distribution unit; here the floor PDU with a transformer and panels, not the rack PDU strip
Read the PDU input and output as separate interfaces
Eaton specifies its PDI PowerPak PDU family at 50 to 300 kVA, with a three-phase, three-wire-plus-ground input and a three-phase, four-wire-plus-ground output. The extra output conductor is the neutral associated with the selected secondary configuration. An input cable schedule copied onto the output side would omit that distinction.
In a 480 V input, 208/120 V output selection, secondary line-to-neutral loads use a neutral absent from the primary cable. Mark that neutral separately from the equipment grounding conductor on the power distribution one-line, then reconcile the cable schedules with the delivered connection diagram.
What transformer compensation taps correct
For installed Liebert FPC equipment, Vertiv's SL-20417 revision 7 user manual describes primary taps spanning -10 percent to +5 percent in 2.5 or 5 percent intervals. These taps change the winding ratio to suit the input supply. They do not continuously regulate the secondary as utility voltage rises and falls.
Using the voltage-ratio relationship behind that tap arrangement, a nominal 480-to-208 V transformer receiving 468 V produces about 202.8 V before load-related regulation: 208 x 468 / 480. The input is 2.5 percent below nominal. Matching the available input tap to the actual supply corrects the ratio; changing a downstream meter's nominal-voltage setting does not.
Keep the tap positions with the transformer test record and the measured input and output voltages. A phase left on a different tap creates a different ratio on that phase. Vertiv's FPC manual requires incoming power and control circuits to be de-energized and locked out before connection work; include that isolation boundary in the PDU commissioning work package.
Ambient limits and optional branch monitoring
Eaton lists a 0 to 40 C operating ambient for the PDI PowerPak PDU. Compare that equipment-room limit with the temperature surrounding the cabinet, including air recirculating from adjacent equipment. A rack strip's higher ambient rating does not extend the floor PDU's rating.
Eaton identifies input/output monitoring as standard on this PowerPak and per-circuit output monitoring as an option. Read the supplied option list and sensor inventory to determine which branch measurements are available. Specify the meter boundary before promising per-rack data to the EPMS.
Distinctions
- Automatic voltage regulator
- Manual transformer taps establish a fixed winding connection. They do not provide the continuing output correction of an automatic regulator.
- Rack PDU
- A PowerPak's three-wire primary cable schedule does not specify a rack strip's inlet cord. Put the strip's inlet connector and equipment-outlet pattern on its own schedule, separate from the floor unit's transformer and panelboard work.
Frequently asked questions
Does a PDU always contain a transformer?
The term also covers distribution-only equipment. Read the one-line and supplied bill of materials before assigning a transformer test, tap setting or secondary grounding arrangement.
Why does my PDU show total load but no branch loads?
Cabinet metering and branch monitoring are separate capabilities. Confirm the supplied sensor and monitoring options, then map the installed channels to the branch schedule.
Sources checked
Also defined as
- Power distribution unit; the floor PDU is a cabinet, the rack PDU is the strip in the rack
- Rack power distribution unit, in basic, metered, or switched grades