Field glossary · component
BCM
BCM is branch circuit monitoring, but the label does not guarantee that every channel measures watts or energy. Some systems report branch current only, while others combine current sensing with voltage measurement to report power, power factor and energy. Specify the required quantities, channel grouping and measurement accuracy before treating the resulting dashboard as a circuit-level capacity or billing record.
Branch circuit monitoring, per-breaker current and power metering reported to the EPMS or DCIM
Current-only monitoring is a different measurement package
Packet Power's Branch Circuit Monitoring V4 brochure separates current-only measurements, amperes and ampere-hours, from full-power measurements that include watts, watt-hours and power factor. A current-only branch display cannot independently establish the real energy used by that branch.
For a single-phase 208 V circuit drawing 16 A, apparent power is 3,328 VA. At a measured power factor of 0.95, real power is 3,161.6 W. Substituting the ampere reading for a watt measurement loses that distinction. A metering hierarchy that reports panel kilowatts but only branch amperes needs both the quantity and its measurement boundary labeled on each display.
Resolution does not establish measurement accuracy
Accuenergy's AcuRev 2100 data sheet lists 0.001 A current resolution separately from its 0.5% current-accuracy specification. Three decimal places describe the reported increments, not a promise that the complete installation measures within one milliampere.
Packet Power publishes branch-monitor accuracy of plus or minus 1.0%, dependent on the current transformer, with a plus or minus 0.5% option. Retain the CT model with the meter specification. A software change that displays another decimal place does not improve the sensor or the measurement chain.
Count measured conductors before counting circuits
Accuenergy's AcuRev 2100 manual, version 1.1.10 revised July 2026, documents 18 single-phase circuits or six three-phase circuits in its respective wiring modes. In three-phase four-wire mode, each circuit occupies three current inputs. Select the wiring mode before translating an input count into a circuit count.
Four three-phase four-wire loads occupy four of the six documented circuit groups, leaving two three-phase groups. The six unused current inputs do not establish six independently configured single-phase circuits in that mode. Accuenergy's three-phase mapping assigns I1, I2 and I3 to the first circuit, then repeats that three-input grouping through I18. Match the software circuit names to those groups and the panel schedule.
Distinctions
- Ampere-hours and kilowatt-hours
- Ampere-hours accumulate current over time. Kilowatt-hours accumulate real power over time. Converting between them requires the relevant voltage and power factor over the same interval.
Frequently asked questions
Does BCM replace a protective breaker?
No. The monitoring channel measures and reports conditions. Circuit protection remains the job of the rated protective device; a dashboard alarm is not its trip curve.