Field glossary · measurement
kW / kVA / kVAR
kW reports real power, kVAR the reactive exchange, and kVA the apparent-power demand on the supply. The distinction matters when combining loads: leading kVAR can offset lagging kVAR, so adding individual kVA magnitudes can overstate the total. For balanced sinusoidal loads, sum kW and signed kVAR first, then calculate their vector magnitude. With distorted or unbalanced loads, retain the meter's total-power method as part of the result.
Real power, apparent power, and reactive power; the genset rating ties them through power factor
Combine kW and signed kVAR before finding kVA
Using the vector relationship documented in Schneider Electric's ION Power Meter Module, combine two balanced sinusoidal loads on the same bus: 300 kW with 225 kVAR lagging and 100 kW with 75 kVAR leading. With lagging demand positive, the totals are 400 kW and 150 kVAR. The square root of 400 squared plus 150 squared is 427.2 kVA, at a power factor of 0.936 lagging.
The separate magnitudes are 375 kVA and 125 kVA. Adding those gives 500 kVA, which misses 72.8 kVA of cancellation in this case. Keep the signed components in the load worksheet. Schneider Electric's ION Power Meter Module documentation defines its wye-mode kW total and kVAR total as the sums of their respective phase registers; it treats the method used for total kVA as a separate setting.
A minus sign needs the meter convention
Schneider Electric's MicroLogic X guide assigns positive active power to power received by the user and negative active power to power delivered by the user. In that convention, inductive reactive power has the same sign as active power, and capacitive reactive power has the opposite sign. A negative kVAR value on an importing load therefore identifies leading reactive behavior under that setup.
Power Monitors' Sign Convention for Power Measurements states that apparent power is unsigned, while real power carries a direction sign. A reversed real-power reading and a leading load are consequently different findings. Record the direction reference, CT orientation, and sign convention with the EPMS readings before interpreting an exported spreadsheet.
The power triangle needs matching measurement definitions
Fluke's 430 Series II manual distinguishes full-spectrum power factor from displacement power factor and separately accounts for harmonic and unbalance quantities. The simple square-root relationship between kW, kVAR, and kVA describes the matching sinusoidal power triangle; it does not reconstruct every meter's full-spectrum apparent power from a fundamental-only kVAR register.
During a generator load-bank test, retain the meter's measured kVA and total PF alongside kW and kVAR. A clean resistive/reactive bank and a building full of nonlinear electronic loads need different attention to those register definitions. Use the meter's configured total instead of forcing unlike values to close a triangle.
Distinctions
- kWh and kVARh
- These accumulate real and reactive power over time. The power readings describe loading; the energy registers describe what accumulated during the selected interval.
Frequently asked questions
Does negative power factor always mean exported power?
No. Schneider Electric ION meters offer IEEE and IEC PF sign conventions. Preserve that setting and read the signed kW register for real-power direction instead of inferring direction from the PF sign alone.
Sources checked
- Schneider Electric: ION Reference, Power Meter Module, phase totals and IEEE/IEC PF sign setting
- Schneider Electric: MicroLogic X User Guide, Power Metering, received/delivered power and reactive sign
- Power Monitors: Sign Convention for Power Measurements, apparent-power magnitude and real-power direction
- Fluke: 434-II/435-II/437-II Users Manual, Appendix A, fundamental, harmonic, and unbalance power definitions
Also defined as
- Datacenter: Real power, apparent power, and reactive power, related by power factor