Field glossary · measurement
kW
A kilowatt describes a rate of energy transfer equal to 1,000 watts. The unit applies to electrical input, shaft output and thermal duty, so the label must say which quantity it represents. A cooling unit removing 60 kW of heat while drawing 15 kW of electricity has a cooling COP of 4.0; those two kW figures describe different sides of the equipment.
Kilowatts; state whether the value describes electrical input or thermal duty.
Keep electrical input and thermal duty on separate lines
EIA defines one kilowatt as 1,000 watts. Sharing a unit does not make two equipment ratings interchangeable. A 60 kW cooling capacity is a heat-removal rate, while a 15 kW meter reading is electrical input at the measured boundary.
The ratio in the opening calculation is 60 / 15 = 4.0. If the 15 kW excludes distribution pumps and other auxiliaries, the result describes that equipment boundary rather than the whole plant. Give electrical input and heat removed separate columns in the liquid retrofit schedule; identical units do not identify the same duty.
Turn interval energy into average kW
EIA defines a kilowatt-hour as the energy delivered by one kilowatt operating for one hour. Reversing that relationship gives interval-average kW = interval kWh / elapsed hours.
A meter accumulating 18 kWh in a 15-minute interval represents 72 kW average over that interval, because 15 minutes is 0.25 hour. The same 18 kWh accumulated over an hour represents 18 kW average. An interval duration omitted from an export therefore prevents a reliable reconstruction of demand.
Peak instantaneous power and interval average describe different behavior. Record the averaging window, interval boundary and timestamp with the meter channel. Do not infer a short load-step peak from an hourly energy total.
Calculate energy from a changing power schedule
At 40 kW for two hours followed by 10 kW for six hours, energy is (40 x 2) + (10 x 6) = 140 kWh. The eight-hour average is 17.5 kW. Neither the 40 kW maximum nor an unweighted average of 40 and 10 reproduces that energy.
For an EPMS meter reconciliation, align the interval boundaries before integrating power. A cumulative kWh register requires end minus start; summing successive cumulative register readings would repeatedly count energy already included.
Convert heat units without changing the measurement boundary
NIST SP 811 converts one International Table Btu per hour to 0.2930711 W, making 1 kW approximately 3,412.14 Btu/h. State the Btu convention where precise conversions matter. Converting thermal duty to kW still leaves it a thermal duty; the conversion does not reveal electrical consumption.
Distinctions
- kWh
- Kilowatt-hours accumulate energy. Kilowatts state the rate at an instant or the average over a named interval.
- kVA
- Kilovolt-amperes describe apparent electrical power. Conversion to real electrical kW needs the matching true power factor.
Frequently asked questions
Can I multiply nameplate kW by every hour of the year?
That calculates continuous operation at that stated rating. Use the measured or scheduled load profile when calculating operating energy.
Why do two reports show different peak kW?
Compare the averaging windows and timestamps. A short measurement peak and a longer demand interval can both be accurate while reporting different maxima.
Sources checked
Also defined as
- Electrical: Real power, the power that does work, turns the shaft, and makes heat and light
- Real power, the actual work the load does