FWS

FWS identifies the facility water system on a liquid-cooling connection schedule. Its useful deliverable is a temperature, flow, and differential pressure at the equipment connection. Vertiv defines CDU secondary supply as primary supply plus exchanger approach: 30°C facility water with a selected 4°C approach produces 34°C secondary water. State the measurement location and fluid mixture alongside the duty so the plant and CDU selections describe the same interface.

Facility water system, the dirtier primary building water loop the CDU rejects heat into, treated like an industrial cooling loop

Used across 4 Anvilfield field guides, most in Datacenter.
Updated

An FWS connection is a defined thermal interface

ASHRAE TC 9.9's 2019 Water-Cooled Servers white paper describes both CDU-separated arrangements and systems delivering facility water directly to IT equipment. The direct arrangement removes the CDU's isolation benefits, including separation of water quality, pressure, and coolant selection. Identify which architecture the equipment actually requires before assigning responsibility for the connection.

At the direct-to-chip connection, schedule the exact supply and return flanges, guaranteed entering temperature, fluid mixture, required flow, and available differential pressure. Record whether the flow includes all concurrent users. A plant-header temperature is not automatically the temperature reaching the most distant CDU.

What does a CDU approach temperature subtract from the design?

Vertiv's Liebert XDU1350 planning guide defines minimum secondary supply temperature as primary facility-water temperature plus approach temperature difference. With 30°C FWS entering the unit and a 4°C selected approach, the corresponding secondary supply is 34°C. Writing 30°C on both sides of the exchanger omits the required driving temperature difference.

Vertiv rates the cited XDU1350 configuration for up to 1.35 MW at a 4°C approach with two pumps operating. Preserve that operating condition with the capacity claim. A warmer facility supply or a tighter secondary-temperature requirement changes the exchanger selection rather than merely changing a control label.

Glycol changes the primary-flow requirement

Vertiv's Figure 4.4 plots a 1,000 kW duty at 17°C primary supply and 22°C secondary supply. Its worked flow calculation increases primary flow from 1,021 to 1,141 L/min when 20% propylene glycol is added, an 11.8% increase. The selection assumes 1,200 L/min secondary water flow with two pumps operating. Preserve those conditions when applying the manufacturer's glycol correction.

The added 120 L/min must pass through the branch, control valve, strainer, and available pump duty. Record the selected glycol concentration alongside the flow test. A balancing report that proves the water-only duty does not establish the glycol duty, even when both reports list the same nominal cooling capacity.

Distinctions

FWS versus condenser water
Condenser water serves the heat-rejection side of a chiller. An FWS is defined by its service to liquid-cooled equipment and can connect through a different plant arrangement.

Field example

A branch gauge reads 3.4 bar on supply and 3.0 bar on return at the CDU connections. The available differential pressure is 0.4 bar. Compare that difference with the selected primary-circuit pressure drop at the required flow; the 3.4 bar static reading alone does not establish that the branch can deliver its duty.

Frequently asked questions

Does FWS mean dirty water?

No. It identifies the facility-side system. Its treatment and cleanliness requirements follow the connected materials, equipment, and approved design; direct-to-equipment service places different demands on it than an isolated CDU connection.

Sources checked