Approach temperature

At 31°C secondary supply and 28°C entering facility water, a CDU operates at a 3°C cold-end approach temperature. This terminal temperature difference tells an estimator how close the cooled circuit gets to its heat sink at the quoted duty. Report the terminal pair, heat load and flows; approach is distinct from the temperature change along either water loop.

The gap between facility water in and coolant out at the heat exchanger; a widening approach signals fouling

Used across 3 Anvilfield field guides, most in Datacenter.
Updated

Which temperatures belong in a CDU approach calculation?

Use the cold end of the exchanger: the warmed facility-water outlet belongs at the other end and does not replace its inlet in this calculation. Label the sensors FWS entering and TCS leaving on the trend, and carry those sensor tags into the CDU commissioning record.

With facility water entering at 28°C and leaving at 33°C, and secondary coolant entering at 38°C and leaving at 31°C, the cold-end approach is 3°C. The hot-end temperature difference is 5°C. Subtracting the two outlet temperatures would produce -2°C, an error in terminal selection rather than evidence that the exchanger created refrigeration.

Read the capacity rating beside the approach

Vertiv rates the XDU450 at 453 kW with a 4°C approach and at 975 kW with an 8°C approach in its SL-70808 specification. Those are separate rating conditions for the same model. Comparing the larger capacity with a submittal requiring the smaller approach overstates the usable heat-transfer duty.

Carrier publishes an approach as low as 2°C for its high-efficiency CDU heat-exchanger option. A 2°C selection and a 4°C selection therefore represent real equipment choices, rather than a universal clean-versus-dirty dividing line. Keep the selected heat duty, primary flow, secondary flow and fluid alongside the temperature gap.

Separate approach from the temperature rise within a loop

Vertiv expresses its 4°C approach as a 7.2°F temperature difference; converting a temperature difference uses the factor 1.8 without adding 32. The secondary loop above has a 7°C return-to-supply drop, even though its approach is 3°C. These describe separate parts of the heat-transfer problem.

Compare the paired probes together at one stable temperature before installing them in their measurement positions. Two probes each specified at ±0.2°C can contribute up to ±0.4°C worst-case error to their difference. A reported change from 3.0°C to 3.2°C therefore needs better measurement evidence before it supports a fouling diagnosis. Compare at matched load, flow and fluid composition as well.

Distinctions

Log-mean temperature difference
LMTD combines the temperature differences at both exchanger ends for heat-transfer calculations. A single approach identifies one terminal gap.
Chiller barrel approach
A refrigerant saturation temperature replaces one of the liquid temperatures. Identify the refrigerant and barrel before comparing that reading with a CDU value.

Frequently asked questions

Does a smaller approach always mean more cooling capacity?

For a specified exchanger, a larger driving temperature difference generally permits more heat transfer. A smaller required approach often demands more exchanger surface for the same duty.

Can I subtract Fahrenheit readings directly?

Yes. Keep both readings in Fahrenheit and report the result as a Fahrenheit temperature difference. Convert the difference separately from the original temperatures.