Field glossary · material

Dielectric fluid

A dielectric fluid must carry heat and maintain electrical insulation under the conditions in its approval. Evaluate viscosity and heat capacity alongside electrical breakdown results: Shell's S5 X, for example, has a typical viscosity of 9.8 mm²/s at 40°C. That number describes circulation resistance, while the breakdown-voltage test describes electrical failure under laboratory conditions. Neither property establishes compatibility with the tank's server materials.

The non-conductive liquid the hardware is submerged in; it carries heat off the components by direct contact

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

Which dielectric-fluid numbers belong on the submittal?

Shell's Immersion Cooling Fluid S5 X technical data sheet, version 1.5, reports a typical kinematic viscosity of 9.8 mm²/s at 40°C. That temperature belongs beside the number: comparing it with another fluid's room-temperature viscosity gives the wrong impression of pumping resistance. Keep the product designation and document revision attached to the laboratory baseline. A viscosity of 9.8 mm²/s is also 9.8 cSt; those units describe the same kinematic property.

Shell lists a typical breakdown voltage of 42 kV for S5 X. This is a laboratory fluid property, not permission to expose a server to 42 kV. Electrode spacing, test method, sample preparation, and contamination affect the result. A tank sample and a supplier certificate are comparable only when their test conditions correspond.

How much heat does an immersion liquid store?

Shell gives S5 X a specific heat of 2,274 J/(kg·K) at 40°C. Using that value, 100 kg of fluid warming by 5 K stores 1,137,000 J, or 1.137 MJ. A 10 kW heat input supplies that energy in about 114 seconds when heat rejection is absent. This calculation explains why fluid inventory provides finite thermal buffering.

Use mass and specific heat when calculating stored heat; use mass flow and temperature rise when calculating continuous heat transport. Relate the stored-heat calculation to the heat-rejection test in immersion tank acceptance. A larger bath delays temperature rise, while a functioning exchanger removes heat continuously.

A high flash point does not mean the fluid cannot burn

Shell's February 2024 S5 X safety data sheet describes the product as capable of burning despite not being classified as flammable. Electrical nonconductivity therefore does not establish the fire behavior of the liquid. Record flash point, fluid quantity, and containment separately from electrical properties.

Retain an unopened reference sample and identify service samples by tank, date, operating condition, and fluid additions. An unexplained electrical-property change calls for tracing moisture, foreign fluid, and handling history. A fresh appearance does not establish an unchanged composition; clear liquids can contain dissolved contamination.

Distinctions

Deionized water
A low initial conductivity does not establish compatibility with energized electronics or with the approved immersion-fluid system.
Kinematic versus dynamic viscosity
Kinematic viscosity is reported in mm²/s or cSt; dynamic viscosity is reported in mPa·s or cP. Converting between them requires the fluid density at the same temperature.

Frequently asked questions

Can I substitute transformer oil in an immersion tank?

A transformer-fluid designation does not establish compatibility with server plastics, adhesives, cables, or the tank equipment. Match the approved immersion product and its compatibility evidence, including any restrictions on mixing.

Can a single-phase immersion fluid serve a two-phase tank?

Select the fluid for the tank architecture. Single-phase operation transports sensible heat without intentional boiling; a two-phase system needs the specified boiling and condensing behavior as well as material compatibility. S5 X data for a single-phase bath do not establish a two-phase selection.

Sources checked

Also defined as

  • A non-conductive engineered fluid the hardware can boil safely; its boiling point is tuned to the chip

Where this shows up

Next step: Find cooling upgrade bids

Back to the full field glossary