Field glossary · measurement
dP
Differential pressure, written dP or ΔP, is reported as an ordered subtraction between two named locations. A cold aisle at +8 Pa relative to its hot aisle is the same condition as the hot aisle at -8 Pa relative to the cold aisle. A useful record retains that reference direction, the tap locations and the instrument range; exchanging the tubes reverses the sign.
Differential pressure across the containment barrier, the primary number that proves the seal holds
Label the high and low pressure references
Write the reading as P(high) - P(low), then name the physical locations attached to those ports. Across a filter, the endpoints are upstream and downstream. Across containment, they are the specified aisle and reference space. A label such as room pressure leaves the second endpoint unresolved.
Pair the containment QA reading with a tap sketch and the fan operating state. A single nonzero reading establishes a pressure difference at the taps; leakage quantity additionally depends on opening area and resistance. Pressure by itself does not quantify how much air crossed a barrier.
Full-scale accuracy can overwhelm a small aisle reading
Dwyer’s standard 0 to 250 Pa Series 2000 Magnehelic has a specified accuracy of ±2% of full scale at 21.1°C, equivalent to ±5 Pa. The allowance applies across the scale, rather than as a percentage of the displayed reading.
At a displayed 10 Pa, that ±5 Pa allowance is half the reading. Dwyer’s standard 0 to 60 Pa model instead carries ±4% full-scale accuracy, or ±2.4 Pa, not the ±2% used for the 250 Pa range. Check the accuracy of the actual range selected; display resolution and a smaller range alone do not establish measurement uncertainty.
Dwyer specifies the Series 2000 diaphragm in the vertical position for its normal mounting orientation. Preserve the manufacturer’s mounting and zero conditions when comparing a portable reading with a permanent gauge.
Convert inches of water without losing the sign
NIST SP 811 converts one conventional inch of water to 249.0889 Pa. Thus 0.04 inH2O is approximately 9.96 Pa, and -0.04 inH2O is approximately -9.96 Pa. The temperature-defined water-column units listed separately by NIST have slightly different factors.
Check that both records use the same reference direction before comparing converted values. A positive cold-to-hot trend and a negative hot-to-cold handheld reading can agree exactly. Trace the tubing to the actual taps rather than changing the controls to make two signs match.
Distinctions
- Gauge pressure
- Gauge pressure references atmosphere. A two-port differential measurement can compare two pressurized points, subject to the instrument’s common-pressure rating.
- Flow rate
- A pressure difference becomes a flow estimate only through a defined resistance relationship, such as a calibrated balancing valve. dP is not itself GPM or CFM.
Frequently asked questions
Does zero dP prove a containment leak?
It establishes equal pressure at those taps within instrument uncertainty. Fan balance, tap location and the control state determine what produced that reading.
Can an air-pressure gauge measure a liquid loop?
Use an instrument rated for the fluid and for the pressure present at both ports. The differential range alone does not establish compatibility or common-pressure capacity.
Sources checked
Also defined as
- Pressure drop across a cold plate, manifold, or path, the lever you balance flow with