Cold plate
Cold plates transfer heat from a mounted component into a flowing coolant through a solid interface and internal fluid passages. Their useful performance is a paired thermal and hydraulic result at a stated flow, coolant and mounting condition. Compare thermal resistance and pressure drop together. The lowest advertised temperature rise does not establish how much pumping pressure the plate needs or how its mounting interface performs.
The micro-channel block clamped to the chip that takes heat into the coolant; its channels are the most fragile part of the loop
Read both curves at the proposed flow
Boyd's CPU/GPU Liquid Cold Plates datasheet for mounting assemblies 668348 and 668359 plots thermal resistance and pressure drop against flow on page 4. Reading the left and right axes separately gives the approximate pairs below. The pressure axis is inches of water, not psi; plate pressure drop is only one part of the server-loop requirement.
Across those plotted points, tripling flow reduces the reported thermal resistance by about 0.008 C/W while increasing plate pressure drop nearly fivefold. Multiplying that resistance change by 500 W gives a 4 C change across the graph's thermal reference points. Use the test definition and mounting condition when comparing this value with a processor temperature; the graph does not identify a junction-to-coolant rating.
| Flow | Thermal resistance | Plate pressure drop |
|---|---|---|
| 1 L/min | Approximately 0.031 C/W | Approximately 0.4 in. water |
| 3 L/min | Approximately 0.023 C/W | Approximately 1.9 in. water |
Carry the thermal interface into the comparison
Boyd specifies processor-compatible mounting hardware and pre-applied thermal grease for these assemblies, with surface flatness contributing to interface performance. The reported resistance curve does not isolate the fluid-side resistance or define the processor-junction reference. Attach the processor contact area, interface material, mounting configuration and temperature measurement locations to a thermal comparison.
During trending, retain component power, component temperature, inlet temperature and branch flow together. Rising component temperature at an unchanged room setpoint does not isolate a fluid problem: contact resistance and changed component power also affect the result. Comparing readings at the same power and coolant condition makes a change in thermal performance interpretable.
Choose coolant by the wetted construction
Boyd's Legacy Liquid Cooled Cold Plates datasheet distinguishes tube-in, finned and microchannel constructions and publishes a material-specific coolant compatibility table. A cold plate is therefore not necessarily a microchannel block. The internal construction affects the flow path, wetted materials and the fluid combinations supported by the manufacturer.
Record the actual plate model and wetted construction before assigning coolant or transferring a pressure-drop curve from another assembly. A clean coolant sample at the CDU cannot identify a restriction in one parallel branch; branch flow and pressure information locate the affected path. Tie the plate and branch identifiers to the direct-to-chip assembly record, with its associated coolant chemistry results.
Distinctions
- CDU
- Conditions and circulates coolant across system boundaries. The cold plate is the local heat-transfer interface at the component.
- Thermal resistance
- Temperature difference divided by heat flow across stated reference points. Junction-to-fluid and plate-to-fluid values cross different interfaces.
Frequently asked questions
Does more cold-plate flow always give proportional cooling?
Boyd's plotted thermal resistance flattens as flow rises while pressure drop continues upward. Compare the paired curves at the intended condition.
Are all cold plates made with microchannels?
No. Boyd lists tube-in, finned and microchannel constructions. Use the model-specific passages, material and coolant requirements.
Sources checked
Also defined as
- Sealed metal block with internal micro-channels mounted on the CPU or GPU to take its heat