ANVILFIELD Try FieldOS

Field glossary · component

QD

QD is shorthand for quick-disconnect, a separable fluid coupling in liquid-cooled IT equipment. Its hydraulic specification matters as much as its mating interface: nominally compatible couplings can impose different pressure losses at the same flow. Select the interface, flow coefficient, coolant and operating limits together, then include both supply and return couplings in the server branch's pressure budget.

Quick-disconnect, a dripless coupling that joins a node to the manifold for live service

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

What the current UQD specification standardizes

Open Compute Project's UQD specification version 2.0.0, dated September 22, 2026, combines the earlier hand-mate UQD and blind-mate UQDB specifications. The document establishes interface and performance requirements; it does not make every compliant product's flow curve identical.

Open Compute Project's UQD v2.0.0 specification permits Cv 1.1 to 1.6 at a reference flow of 1.7 US gallons per minute for size-04 couplings tested with water. Keep the supplier's actual curve with the component schedule. A connection that mates successfully has passed a mechanical check, not the branch-flow calculation.

Calculate the loss through a coupling pair

Danfoss's September 2026 Hansen UQD fact sheet lists Cv 1.37 for its UQD04 at a rated flow of 1.7 US gallons per minute. Using the OCP relationship for water, pressure drop in psi equals flow in US gpm divided by Cv, then squared.

At 1.7 gpm, that coupling calculates to approximately 1.54 psi. A supply coupling and a return coupling in the same flow path therefore account for about 3.08 psi before the cold plate, manifold and hoses are added. Use the actual coolant correction or measured curve when its properties differ from water. Carry the calculated coupling allowance into the liquid-loop commissioning worksheet so the measured branch pressure drop can be reconciled with its component losses.

Rated flow is a reference point, not a hard flow stop

Danfoss defines rated flow in that fact sheet as the reference flow used to measure pressure drop and determine the published Cv. The label is therefore not a statement that no additional flow can pass through the coupling.

OCP UQD 2.0.0 lists 100 psig maximum operating pressure and 300 psig minimum burst pressure as its qualification baseline. Supplier ratings can exceed that baseline: Danfoss's cited UQD04 has a 232 psi connected working-pressure rating. Keep operating pressure, destructive burst qualification and permitted connection or disconnection conditions as separate specification fields.

Keep the part number with the hydraulic result

Record the plug, socket, termination and seal material as a pair. A replacement that changes flow resistance alters branch balance even if its outside interface fits. Compare differential pressure at the same flow and coolant condition when investigating a branch that changed behavior after a coupling replacement.

Distinctions

QD versus OCP UQD
QD names the general coupling function. OCP UQD identifies a specified interface and qualification scheme; the abbreviation QD on a parts list does not establish conformity with it.
QD bushing
In belt-drive work, QD identifies a mechanical shaft bushing. That usage in the sheave-alignment guide is separate from a liquid-cooling connector.

Sources checked

Where this shows up

Next step: Follow liquid-cooling procurements

Back to the full field glossary