Rack PDU

A rack PDU is the cabinet's equipment-outlet assembly; on a monitored model, an outage has two independent indications, the electrical readings and the management controller's status. Raritan's PX4 can keep its controller online through power sharing after an inlet loss without restoring outlet power. Specify which inlets and outlets are measured and which are switched before assigning a repair or monitoring scope.

The power distribution strip in the cabinet, in basic, metered, or switched grades, commonly 0U in the rear channel

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

A replaceable network controller is not a second power inlet

Raritan's PX4 FAQ states that an iX controller can be replaced on a powered PDU without interrupting connected equipment or changing outlet states. The replacement obtains its configuration from data stored in the PDU chassis. That feature lets operations distinguish a management repair from replacement of the power-distribution chassis.

Raritan's technical specifications also describe controller power sharing between compatible, like-versioned PDUs. This preserves sensor and network visibility when one PDU loses its incoming supply. The described shared power serves the controller; it does not energize that PDU's server outlets from the neighboring PDU.

A PDU that remains visible in DCIM after its inlet loses power is reporting continued controller operation. Read inlet status, outlet measurements and controller availability separately, and retain the electrical interfaces and branch limits established during rack PDU selection.

Specify meter accuracy at the point you will use

Raritan specifies plus or minus 0.5 percent metering accuracy for PX4 measurement points and plus or minus 1.0 percent for PX3. Apply the outlet specification only where outlet metering is fitted. Raritan labels its PX1000 series input-metered and its PX4000 series outlet-metered; buying a PX4 generation device alone does not establish outlet-level monitoring.

An energy total and a power reading also describe different intervals. At a steady measured 3.0 kW, a 24-hour interval accumulates 72 kWh. A single 3.0 kW snapshot cannot establish that daily total when the equipment load changes. Preserve timestamps and interval definitions when exporting the PDU readings into a tenant or efficiency report.

The rear-channel environment belongs in the model selection

Raritan's PX4 FAQ gives a 0 to 60 C operating environment for that product family. Measure the surrounding air at the PDU location rather than substituting a room-average or rack-inlet temperature. The strip operates beside the rear exhaust even when the inlet sensors show normal conditions.

After a controller change, verify the equipment identity, measurement units, network address and alarm destinations against the rack record. Keep the PDU serial number and inlet assignment with the cabinet deployment record so an alarm identifies a physical strip and supply path.

Distinctions

Inline power meter
An inline meter measures a circuit through which power passes. It does not provide the rack strip's collection of equipment outlets simply because both products report kW and kWh.
Controller power sharing
This maintains management electronics on supported models. Server source redundancy still depends on the power connections feeding the equipment.

Frequently asked questions

Can I change a rack PDU controller without shutting down servers?

The PX4 iX replacement feature described by Raritan preserves outlet states and power. Establish that the installed model supports that feature before assigning a controller-only replacement scope.

Does a missing PDU network response mean a rack is off?

It establishes lost communication. Correlate it with the inlet, outlet and server power observations before recording an equipment power interruption.

Sources checked

Also defined as

  • The power strip inside a cabinet that distributes a branch circuit to the gear's power supplies