Field glossary · measurement
Phase balance
Phase balance needs a named quantity and formula: currents of 90, 100 and 110 A have 10% current unbalance by the maximum-deviation-from-average method. The same percentage cannot be applied to supply voltage as an acceptance limit. Record all three phase readings at a matched operating state, identify whether they are amperes or line-to-line volts, and compare with the criterion for that equipment.
Spreading load evenly across the three phases so no phase overloads and neutral current stays low
Calculate deviation from the average, not the highest phase
Fluke calculates percent unbalance as maximum absolute deviation from the three-phase average divided by that average, multiplied by 100. Specify whether the inputs are line currents or line-to-line voltages.
Currents of 90, 100 and 110 A average 100 A. The largest deviation is 10 A, giving 10% current unbalance. Dividing the 20 A high-to-low spread by the average gives 20%, which is a different statistic. A report must identify its formula before two percentage readings can be compared.
When relocating circuits during PDU and RPP commissioning, retain the before-and-after phase currents at comparable load. A lower percentage caused by a reduced overall workload is different evidence from a corrected phase allocation.
Apply the motor voltage criterion to voltage measurements
DOE Motor Systems Tip Sheet 7 recommends keeping voltage unbalance at motor terminals at or below 1%. Its calculation uses the maximum line-voltage deviation from the average line voltage. That recommendation is not a 1% branch-current balancing requirement.
For line-to-line readings of 472, 480 and 488 V, the average is 480 V and the largest deviation is 8 V. The resulting voltage unbalance is 1.67%. A normal-looking average does not remove the unequal voltage impressed on the motor windings.
Small voltage errors can produce much larger motor currents
DOE reports that motor current unbalance can be six to ten times the voltage unbalance. A visibly uneven motor current set therefore calls for measuring the supply voltages as well as inspecting the load and connections.
Take the three readings under a comparable stable operating state. Sequential clamp readings during a changing process can manufacture an apparent imbalance from different moments. At a rack distribution panel, a synchronized branch or feeder record is especially useful when workloads shift rapidly.
Evaluate A and B paths in their own operating states
An evenly shared normal load can move onto a different phase distribution after a feed loss. Preserve phase currents for each source path under normal operation and the specified single-path condition. A combined total that looks balanced does not establish that either surviving path has enough per-phase capacity.
Neutral current belongs in the record too, but it is not a substitute for these phase readings. Its magnitude includes the vector relationship among phase currents and, on nonlinear loads, harmonic contributions. A small fundamental imbalance percentage does not describe every component of neutral current.
Distinctions
- Phase rotation
- Rotation describes the sequence of phases. A correctly rotating supply can still have unequal voltage magnitudes or unequal load currents.
- Total feeder utilization
- A modest aggregate kW or kVA does not prove spare capacity on the most heavily loaded phase.
Frequently asked questions
Is a ten-percent current target also a voltage target?
No. State separate criteria for phase current and supply voltage; the DOE motor recommendation concerns voltage unbalance.
Can I compare percentages from different meters?
Match the quantity, formula, time interval and operating state. The Fluke 434-II/435-II/437-II manual uses symmetrical components for supply-voltage unbalance, including phase-angle relationships; that is a different calculation from the maximum magnitude deviation used here. Equal percentage labels do not establish equal calculations.