Field glossary · equipment
0U PDU
A 0U PDU reserves no numbered equipment positions, yet its installed depth can decide whether a server fits: Lenovo lists basic vertical strips with body depths of 53 mm and 75 mm before cords are connected. Zero-U is a mounting description, not a common dimensional envelope. Specify the body, peg interface and plug projection together, then prove clearance with the server's cable-management arm moving through its full travel.
Vertical rack power strip mounted in the side channel, taking no rack-unit space
How deep is a 0U PDU with the plugs installed?
Lenovo Press LP1884, updated March 27, 2026, lists the 4PU7A93176 basic 0U PDU at 1490 x 52 x 53 mm and the 4PU7A93177 at 1490 x 56 x 75 mm. Those dimensions are length, width and depth. The second body needs 22 mm more depth before adding a connected cord. A purchase description that says only 'vertical 0U' leaves that difference unresolved.
Use the product drawing to locate the mounting face, then measure from that face to the deepest installed plug or cord restraint. A bare-chassis depth omits the connector projecting toward the server or rear door. Measure the cable-management arm through its travel as well as the closed position; its swept space belongs in the cabinet fit calculation.
With 90 mm measured behind the mounting face and 25 mm of measured plug projection, the 53 mm body occupies 78 mm and leaves 12 mm. The 75 mm body occupies 100 mm and misses by 10 mm. Those are connector-clearance results; add the cord's bend envelope and moving-arm clearance before accepting the fit.
Put the populated dimensions on the cabinet selection schedule. A dimension taken from an empty strip cannot settle a clearance dispute after the equipment cords arrive.
Mounting pegs do not guarantee matching brackets
Schneider Electric's June 2026 NetShelter Zero U FAQ says these PDUs ship with mounting pegs, not vertical mounting brackets. It identifies AR7711 as an accessory bracket designed for NetShelter cabinets and does not guarantee its fit in third-party cabinets. Put the rack model, PDU model and required adapter on the same equipment schedule.
A successful fit requires the peg heads to enter the keyholes, the shoulders to seat, and the body to remain captured after cord insertion. A peg that enters an opening but cannot seat fully is an unresolved mounting mismatch. Record the adapter part number so a replacement strip does not arrive without its mounting interface.
Read the temperature rating at the rear channel
Lenovo specifies an operating range of -5 to 60 C for both of those basic 0U models. That limit belongs to the named products; the 0U designation itself supplies no temperature rating. Measure the air surrounding the strip in its rear-channel location, where server exhaust reaches it, and compare that reading with the selected model's operating limit.
Distinctions
- 1U horizontal PDU
- A horizontal unit reserves equipment mounting height. Its connector clearance still needs its own measurement; rack-unit height does not describe the complete installed envelope.
- Metered or switched PDU
- These describe electrical features. Zero-U describes placement, so a basic strip and an outlet-switched strip can both be 0U.
Frequently asked questions
Will any 0U PDU fit a 42U cabinet?
No. The 53 mm and 75 mm Lenovo bodies show why a shared mounting category does not settle fit. Resolve rear-channel length, peg compatibility and populated connector depth from the two product drawings and the cabinet measurements.
Where do I allow space for power cords?
Include plug projection and the cord's permitted bend in the installed envelope. Use the rack cable management guide to resolve the route after the body and connector dimensions are known.