Field glossary · component
DAC
A passive DAC, or direct-attach copper assembly, connects transceiver cages through an electrical twinax path without converting data to light. Select it by part number and supported host configuration, rather than connector fit alone: Cisco's 25G SFP28 family requires BASE-R forward error correction for a 3 m cable while its 2 m cable needs no FEC. A longer replacement can therefore change the endpoint configuration even when speed and connector format stay the same.
Direct-attach copper, a short fixed-length cable with transceivers attached, common in high-density racks
Cable length changes the 25G FEC requirement
Cisco's 25GBASE SFP28 data sheet, updated September 16, 2026, specifies no required FEC for its 1, 1.5 and 2 m passive copper cables, BASE-R FEC for 2.5 and 3 m, and RS-FEC for 4 and 5 m. Apply those FEC settings to the listed Cisco assemblies.
Replacing a 2 m assembly with a 3 m SFP-H25G-CU3M therefore changes more than routing slack. Verify BASE-R support and configuration at both endpoints. A cable that reaches the port physically still needs the supported electrical link configuration.
Where the error correction actually happens
For the NVIDIA links covered by its Cable Management FAQ, dated March 23, 2023, FEC processing runs in host switches and network cards. NVIDIA requires matching FEC types at the endpoints. A passive DAC relies on those host functions; the active-copper label alone does not identify the processing inside another vendor's cable ends.
BASE-R and Reed-Solomon are different correction schemes. Record the actual mode, rather than writing only 'FEC enabled.' Attenuation also depends on conductor thickness, so cable length alone does not identify the required mode across manufacturers.
Passive and active copper at 800G
NVIDIA's 100G-PAM4 copper overview, updated November 18, 2025, lists straight passive DAC assemblies from 0.5 to 2 m, with passive splitters reaching 3 m. It separately lists twin-port OSFP linear active copper cables for 800G-to-800G switch links at 3, 4 and 5 m. The linear active version adds signal-conditioning circuitry in the ends. A 3 m passive splitter listing therefore does not qualify a 3 m straight passive replacement.
That portfolio lists passive DAC consumption at 0.1 W per end. A 64-link inventory therefore accounts for 12.8 W across 128 cable ends, calculated from NVIDIA's figure; switch and adapter power remains separate. 'Passive' describes the data path, so treating the complete assembly's power allowance as zero misses the manufacturer's stated value.
A DAC link that flaps under load
NVIDIA's ConnectX physical-link triage guide, updated October 8, 2026, calls for evidence from both endpoints and one controlled component change at a time. Capture good and failed states: negotiated speed, lane count, FEC mode, per-lane errors, link-down reason and cable identity. A link light alone omits those distinctions.
Record each change as a comparison: suspect cable on the original ports, compatible replacement on those ports, then a supported alternate port if needed. A fault that follows the cable points to a different repair from one that stays at the same port. Keep the cable ID and both endpoint results together so the rack cable-management record identifies the assembly to replace. The GPU optics and cabling guide places that replacement in the cluster's link schedule.
Distinctions
- Active optical cable
- An AOC contains fiber and optical conversion within a fixed assembly. Its integrated ends resemble a DAC's buying format, but electrical-copper reach and FEC rules do not transfer to it.
- Pluggable optic with separate fiber
- Separate optics and jumpers let a technician replace the optical module independently of the cable plant. A failed integrated DAC is replaced as an assembly; choosing a separable optical link also introduces the media and reach decisions in the fiber-selection guide.
Frequently asked questions
Can I use a 5 m DAC instead of a 2 m DAC?
For Cisco's cited SFP-H25G family, the 5 m cable requires RS-FEC while the 2 m cable does not require FEC. The replacement needs support at both hosts, not just matching SFP28 cages.
Can an optical power meter test a DAC?
An optical power meter measures light; a DAC carries electrical signals. Diagnose the link through host status, FEC and error counters, using the platform's supported electrical diagnostics.
Sources checked
- Cisco 25GBASE SFP28 Modules Data Sheet, updated September 16, 2026: passive cable lengths and FEC
- NVIDIA Cable Management Guidelines and FAQ, March 23, 2023: host FEC and cable attenuation
- NVIDIA 100G-PAM4 Copper DAC and LACC Cables Overview, November 18, 2025: reaches and power
- NVIDIA ConnectX NIC Triage Guide, October 8, 2026: physical link, FEC and BER
Also defined as
- Direct attach copper, a short twinax assembly with built-on transceivers for intra-rack links