ANVILFIELD Try FieldOS

Field glossary · component

MWBC

MWBC means multiwire branch circuit: multiple ungrounded branch conductors use one shared grounded conductor within a defined supply arrangement. The source winding determines the return-current arithmetic. Two 20 A loads cancel in the neutral on opposite 120/240 V legs under equal-power-factor sinusoidal conditions; the same loads on two phases of 208Y/120 V produce 20 A in the neutral. That distinction belongs on the circuit record before a shared-neutral fault is diagnosed.

Multi-wire branch circuit: two opposite-phase hots sharing one neutral, with a simultaneous disconnect

Used across 4 Anvilfield field guides, most in Electrical.
Updated

Two 120 V branches can have different neutral arithmetic

For sinusoidal loads with equal power factor on opposite 120/240 V legs, neutral current is the magnitude of the difference between leg currents. With 20 A on one leg and 10 A on the other, it is 10 A. This follows from the 180-degree separation of the supply legs.

Two phases of a 208Y/120 V system are separated by 120 degrees. For equal-power-factor sinusoidal loads, their neutral current is the square root of IA squared plus IB squared minus IA times IB. Loads of 20 A and 10 A produce 17.3 A in the shared neutral. Two equal 20 A loads produce 20 A, not zero. Three balanced phase loads give the different three-way cancellation described in the MWBC guide.

A common disconnect does not identify the supply phases

OSHA 1910.305(a)(2)(viii) requires simultaneous disconnection of all ungrounded conductors of a temporary multiwire branch circuit at its originating outlet or panelboard. OSHA 1910.305 also recognizes approved breaker handle ties for that disconnect function. The rule concerns disconnection; phase identification remains another check.

OSHA 1910.304(b)(1) requires phase-and-system identification for accessible MWBC ungrounded conductors where a building contains more than one nominal voltage system, with the identification method posted at each branch-circuit panelboard. Record the source voltage and shared-neutral grouping in the panel directory; a handle tie alone does not prove the handles occupy the required phases.

An open neutral turns unequal loads into a voltage divider

Two resistive loads of 8 ohms and 16 ohms normally draw 15 A and 7.5 A on separate 120 V legs. If their common neutral opens while both remain connected across 240 V, the series current becomes 240 divided by 24, or 10 A. The loads then receive 80 V and 160 V.

Neither leg needs to exceed a 20 A breaker rating for the 160 V exposure to occur. Overcurrent protection therefore does not establish protection from this open-neutral condition. Identify shared-neutral continuity and the actual circuit arrangement when resolving unequal line-to-neutral voltage; a normal-looking breaker handle does not answer either question.

Distinctions

Two circuits on one phase
Sharing a return between same-phase circuits adds their current rather than producing the intended opposite-leg cancellation.
Common trip
Simultaneous manual disconnection and common automatic tripping are different functions. The circuit and protection requirements establish which device arrangement applies.

Frequently asked questions

Do two equal 120 V loads always cancel in the neutral?

They cancel on opposite legs of a 120/240 V supply under the stated sinusoidal conditions. Two phases of a 208Y/120 V supply do not have that same cancellation.

Can an open neutral damage equipment without tripping a breaker?

Yes. The 8-ohm and 16-ohm load calculation produces 160 V on one load while each leg carries only 10 A.

Sources checked

Also defined as

  • Multiwire branch circuit, ungrounded conductors sharing one neutral, requiring simultaneous disconnect
  • Multiwire branch circuit, two or three ungrounded conductors on different phases sharing one neutral

Where this shows up

Next step: Find branch-circuit retrofit bids

Back to the full field glossary