Main bonding jumper
The main bonding jumper connects the service grounded conductor to the service equipment's grounding and enclosure network. Find it by locating the service disconnecting function, rather than by looking for the largest breaker in the building. An outdoor service-rated transfer switch can move that bonding location ahead of an indoor panel that still has its own main breaker. The indoor panel's wiring must reflect that actual supply arrangement.
The connection of the grounded service conductor to the service-disconnect enclosure and equipment grounding conductors under NEC 2023 Section 250.24(C)
When the service bond moves into an outdoor ATS
ABB's Zenith ZTGSE/ZTSSE service-entrance transfer-switch manual provides a neutral-to-ground bonding connection for field installation as required and identifies its location on the equipment drawing. That service-rated transfer assembly can be the bonding location ahead of the indoor distribution equipment.
Suppose the one-line places a service disconnect and neutral bond inside an outdoor transfer assembly, followed by an indoor panel with a 200 A main. Mark the indoor run as a feeder and show its neutral isolated from its enclosure. This drawing exercise locates the MBJ by electrical function and gives the service entrance record a specific enclosure designation.
Inspect the jumper hardware and its contact surfaces
Oregon's inspector checklist distinguishes suitable grounding fasteners under NEC 250.8 from conductive contact surfaces under 250.12. Its screw-connection check rejects sheet-metal screws, and its ground-lug check calls out paint removal. In the field, verify the equipment's identified bonding assembly and prepared contact surfaces together; a larger conductor does not correct an unsuitable fastener.
Use the equipment's identified bonding hardware and assembly details. Record the strap or screw location, mating surfaces, hardware identification, and the manufacturer's tightening value. A green screw seen in a photograph is evidence of a component's presence; the record must also show whether it establishes the intended electrical connection in that model.
Continuity alone cannot locate an unwanted second bond
With all sources isolated and absence of voltage verified, a neutral-to-ground continuity reading in a feeder panel can still pass through the upstream service bond. Identify and control the parallel test paths before attributing that reading to a local strap. The useful result locates a connection in a named enclosure, rather than merely reporting that neutral and ground are continuous somewhere in the system.
Oregon's inspection guide separately lists the grounded conductor at each service disconnect, the main bonding jumper, and an isolated subpanel neutral. These are distinct checks in the panelboard installation record. Identify the service assembly by location and equipment designation so the next panel change starts from the actual supply arrangement.
Distinctions
- System bonding jumper
- A separately derived transformer or generator uses a system bonding jumper for its own source. That jumper is not an additional main bonding jumper for the utility service.
- Main breaker
- A main breaker identifies a disconnect or protective function in its assembly. It does not by itself identify where the service ends.
Frequently asked questions
Is there exactly one neutral-to-ground bond in every building?
The correct count follows the services and separately derived systems. Several legitimate source bonds can exist in one building without authorizing a downstream feeder bond.
Can I replace a factory bonding strap with any copper wire?
The assembly's identified hardware and instructions establish its intended connection. A field wire needs its own permitted sizing and termination basis rather than an assumed equivalence.
Sources checked
Also defined as
- The connection tying neutral to enclosure and ground, installed only at the service
- The single connection of neutral to equipment ground, at the service only