Field glossary · property
AIC
AIC means ampere interrupting capacity, but a usable survey entry needs more than a kA value: it needs the voltage, device identity and supply configuration at which the device can interrupt that current. UL's molded-case breaker guidance uses 5,000 A for products originally supplied without an interrupting-rating marking. That convention does not resolve an unreadable label, and a large kA marking cannot make a breaker suitable for the wrong voltage system.
Ampere interrupting capacity: the maximum fault current an overcurrent device can interrupt, a device-level rating
Where to find a breaker's interrupting rating
UL Solutions' Molded Case Circuit Breaker Marking and Application Guide assigns a 5,000 A interrupting rating to covered breakers without a marked interrupting value. Do not turn a missing photograph, inaccessible side label or worn marking into evidence that the breaker was manufactured without a rating. Retrieve the catalog record and the complete marking before entering the value in the equipment register.
UL's guide requires each interrupting-current value to appear with its corresponding voltage when a breaker has multiple ratings. Preserve that pairing in the survey. A photograph cropped to the largest kA number loses the information needed to apply it. Enter the verified current-voltage pair on the one-line diagram, tied to the installed device's identity.
Why a slash voltage can reject an otherwise adequate AIC
UL Solutions pairs a 480Y/277 V breaker's 480 V circuit limit with a 277 V limit to ground. ABB's Manual Motor Starter Guide, section 7.2.3, also identifies the solidly grounded circuit condition for slash-rated breakers. Record all three conditions in the survey; a 480 V resistance-grounded supply does not become a permitted 480Y/277 V application simply because the normal phase voltages resemble those of a grounded wye supply.
For a 240/120 V high-leg delta system, UL's guide identifies 208 V from the high leg to neutral and calls for a straight-rated 240 V three-pole breaker instead of a 120/240 V three-pole breaker. Capture the supply configuration along with the line-to-line voltage. A record containing only '240 V, three phase' misses the distinguishing fact.
Replacement breakers need a documented application
A replacement with the same handle rating can have different voltage, interrupting and compatibility conditions. UL's Panelboard Application Guide describes a classified replacement category for 15 to 60 A, 120/240 V AC breakers in specifically identified 120/240 V AC panelboards rated 225 A or less, on circuits with no more than 10 kA available short-circuit current. The compatibility list and every one of those limits belong in the replacement record.
Record the replacement's exact catalog number and the documentation supporting its use in that panel. Keep any series-combination record with it. NFPA lists the 2026 NEC as the current edition; the project's adopted installation rules and the equipment's documented ratings belong together in the panelboard record.
Distinctions
- Symmetrical RMS versus peak current
- UL's breaker marking guide permits RMS symmetrical interrupting markings and prohibits asymmetrical interrupting-current markings. A peak-current result from a study must retain its own designation rather than being entered as AIC.
- SCCR
- Record a replacement breaker's AIC without changing the panelboard's marked SCCR. Raising the device value in the equipment register supplies no evidence to raise the assembly value; keep each marking and its supporting documentation attached to its own item.
Field example
A survey finds 8 kA available fault current and a three-pole breaker marked 22 kA at 120/240 V on a 240/120 V high-leg delta supply. The current comparison passes, but the 208 V high leg exceeds the breaker's 120 V line-to-ground limit. The replacement specification needs the correct straight voltage rating as well as sufficient interrupting capacity.
Frequently asked questions
Can I establish AIC with a breaker trip test?
A field trip test checks operation under its test conditions. Establish interrupting capability from the device's certification and ratings documentation; a successful trip does not create a new interrupting rating.
Does an unreadable label mean the breaker is rated 5 kA?
No. UL's unmarked-breaker convention concerns the product's original marking requirements. An unreadable marking leaves the installed device's identity and rating unresolved.
Sources checked
- UL Solutions: Molded Case Circuit Breaker Marking and Application Guide, voltage ratings and item 14
- UL Solutions: Panelboard Application Guide, classified replacement breakers and short-circuit ratings
- NFPA 70: publisher identifies the 2026 NEC as current
- ABB Manual Motor Starter Guide, revision C, section 7.2.3: straight and slash voltage application conditions
- Siemens Catalog LV 18, 2026, page I/8: grounded wye slash ratings and straight-rated networks
Also defined as
- Ampere interrupting capacity, the fault current a breaker can open safely, in kA
- Ampere interrupting capacity, the fault current a breaker can safely interrupt