ANVILFIELD Try FieldOS

Field glossary · property

Continuous load

Continuous-load sizing starts with a forecast: will the maximum current last at least three hours? Separate that sustained portion from the rest of the load before applying the sizing factor. Hours with equipment switched on do not establish how long its maximum current persists. A 100-percent-rated breaker changes the sizing treatment only within its specified assembly, enclosure, and conductor application.

A load expected to run at maximum for 3 hours or more, generally taken at 125 percent

Used across 4 Anvilfield field guides, most in Electrical.
Updated

Separate the continuous part before multiplying

Eaton’s January 2026 application paper AP01200008E describes ordinary circuit sizing as noncontinuous load plus 125 percent of continuous load. With 60 A continuous and 20 A noncontinuous, that calculation is 20 + 1.25 × 60 = 95 A. Multiplying the entire 80 A by 1.25 instead produces 100 A and loses the distinction between the two load portions.

The calculation establishes a required sizing basis, not a complete conductor or breaker selection. Carry it into the termination, adjustment, and equipment requirements in feeder and branch-circuit design. Preserve the load schedule that explains which current was expected to persist.

A 100-percent breaker needs a 100-percent assembly

Eaton’s 2026 paper explains that the 100-percent continuous-load application depends on a listed assembly with the specified circuit breaker, enclosure, and conductors. The marking on a replacement breaker alone does not establish the rating of an existing panel or switchboard.

Enclosure dimensions and heat dissipation are part of the tested application. Replacing an ordinary breaker with a 100-percent-rated model does not remove those conditions. Obtain the assembly identification and installation requirements before changing the sizing basis in a schedule or label.

The insulation rating and ampacity column are separate

Eaton specifies 90°C-insulated wire sized using 75°C ampacity for the 100-percent-rated applications described in AP01200008E. ABB’s Tmax XT catalog states that requirement for its 100 A XT1 application. Read the particular frame’s instructions: the catalog gives different application details for other frames, so a hotter insulation marking alone cannot authorize a hotter ampacity column.

Capture conductor material, insulation rating, terminal conditions, enclosure, and breaker application together. A submittal that lists only amperes and a 100-percent label omits the details that establish whether the exception is available. These details become especially important when a retrofit changes only the breaker and leaves the enclosure in place.

Distinctions

Demand load
Demand treatment addresses the load counted for a feeder or service under permitted calculation rules. Continuous-load treatment addresses sustained current and its sizing effect; one label does not cancel the other.

Frequently asked questions

Does an 80-percent application mean the breaker trips at 80 percent?

No. The continuous-load sizing relationship is not a statement of instantaneous trip current. Trip performance follows the breaker’s characteristic, settings, and operating conditions.

Sources checked

Also defined as

  • A load at its maximum for 3 hours or more, sized at 125 percent of rated current
  • A load at maximum current for three hours or more, sized at 125 percent

Where this shows up

Next step: Target industrial electrical accounts