EVSE
EVSE stands for electric vehicle supply equipment: the installed connection equipment that governs power delivery to a vehicle. An estimator should count independently usable charging ports and identify the power available when they operate together. Two plugs can serve one port, and two ports can share a power cabinet. For AC equipment, the vehicle's onboard charger sets another limit between the site's rated supply and the energy reaching the battery.
Electric vehicle supply equipment, the charger, treated as a continuous load under Article 625
Count ports rather than counting plugs
The U.S. Department of Energy's Alternative Fuels Data Center defines an EV charging port as equipment capable of charging one vehicle at a time, even when multiple connectors are available. A charger location, charging port, and connector are therefore separate inventory units.
A dispenser offering CCS and another connector from one power channel can have two plugs and one port. A dual-port unit sharing one cabinet has two ports, but the cabinet's total power still limits simultaneous output. Use the manufacturer's simultaneous-output schedule when preparing an equipment count for the workplace and retail market.
Why the same AC current gives different kilowatts
Tesla's Dynamic Power Management table specifies a 48 A charging limit on a 60 A branch breaker, with an approximately 11.5 kW rating at 240 V. On a 208 V supply, 48 A represents 9.98 kVA; at unity power factor, that is 9.98 kW. Real AC power is voltage multiplied by current and power factor.
For a 208Y/120 V parking installation, put the manufacturer's 208 V output in the bid schedule beside its advertised 240 V output. The vehicle can accept less current than either rating. During acceptance, compare the station's permitted current, the vehicle's requested current, and the measured input power to identify which limit controls the session.
Convert a parking visit into an energy allowance
With power factor taken as 1.0, a steady 32 A session at 208 V supplies 6.656 kW to the vehicle, or 26.624 kWh over four hours. Charging losses and auxiliary consumption reduce the portion stored in the battery. A sharing system that halves the session current also halves that calculated energy while the limit remains active.
UL's 2026 NEC Article 130 explanation states that EVSE managed by a PCS is limited to the load that the PCS permits. The listed safety control and the site's power budget therefore belong on the equipment schedule alongside individual port ratings. The installation guide covers the electrical acceptance work; the operating record should add simultaneous-use performance.
Distinctions
- AC onboard charger
- The vehicle converts AC to battery DC. Its conversion limit can be below the EVSE supply limit.
- DC power cabinet
- A cabinet can supply multiple dispensers. Cabinet count alone does not identify port count or simultaneous power.
Municipal EVSE packages appear in PorchRocket Bid Control alongside early charging-project signals from public budgets and capital plans.
Frequently asked questions
Is a two-connector charger always a two-port charger?
No. DOE counts ports by the number of vehicles that can charge at one time. Two alternative connectors serving one vehicle are one port.
Is charger output kW the same as input service kW?
No. Conversion losses and auxiliary loads separate input demand from delivered DC output. Use the equipment's rated input data for the supply design.