Field glossary · component
Pigtail
An electrical pigtail brings a splice or equipment connection to one terminal through a short wire lead. The lead can be copper without being an aluminum-wiring repair: IDEAL stocks grounding tails in 6.5, 8, 10, and 12 inch lengths, as well as black and white connection leads. Order by circuit function, conductor material and gauge, insulation, and both end fittings. A lead's length identifies its reach; the connector and device markings determine which terminations it fits.
A short copper conductor added to the aluminum with a listed connector so copper lands on the device
Choose the lead by its ends, not just its length
IDEAL's grounding-products catalog lists 12 AWG solid grounding tails in 6.5, 8, 10, and 12 inch lengths. It also lists stranded versions with fork or ring terminals, plus white and black nongrounding pigtails. These are stock product dimensions and configurations, not a code rule that every pigtail must have one length.
Describe both ends on the material list: stripped wire to a splice, a loop and screw to a box, or a terminal that fits the device. The screw or terminal belongs to the assembly specification just as much as the wire. A green grounding tail is not interchangeable with a white neutral lead merely because both are copper. The device wiring guide explains where each circuit function lands.
AlumiConn ports: conductor range, torque and voltage
King Innovation's AlumiConn two-port instructions, revision D, list a 300 V maximum, 12 to 10 AWG solid aluminum, and 18 to 10 AWG solid or stranded copper, with one conductor per port. They specify a 5/16 inch strip length and prohibit connector reuse. That wire range describes connector acceptance; it does not size the pigtail for the circuit load.
King Innovation specifies 10 in-lb for 12 AWG solid aluminum in AlumiConn and 15 in-lb for 10 AWG solid aluminum or any permitted copper conductor. A joint between 12 AWG aluminum and a 12 AWG copper tail consequently has different settings on its two screws. Tightening both screws to the copper setting exceeds the aluminum port's specified value.
King Innovation's revision D drawing gives a connector envelope of 0.91 by 0.65 by 0.77 inch. Include those dimensions in the box-layout notes for an aluminum repair; a completed port count does not establish that the connector will fit behind the device.
Count the conductors joining each pigtail
One incoming conductor joined to one tail makes a two-conductor splice. Adding an outgoing conductor changes it to three. AlumiConn's one-conductor-per-port restriction means its two-port model cannot hold that second arrangement. Write the actual conductor combination before choosing the connector, including which wires are solid or stranded.
Keep the splice count separate from the box-volume calculation. The box fill guide handles the allowances; connector placement still has to let the device seat without pushing a terminal sideways or drawing a tail tight. A longer tail provides working reach, while a larger box provides room for the connection assembly. Those solve different access problems.
Distinctions
- Fiber pigtail
- This is an optical lead with a connector at one end and fiber available for splicing at the other. Its connector and fiber type belong in the splice loss budget, not an electrical wire-size schedule.
- Steam-gauge pigtail
- This name describes a looped siphon between a steam connection and a pressure gauge. A gauge takeoff and an electrical device box use the same word for entirely different components.
Frequently asked questions
Can a pigtail be stranded wire?
Yes. IDEAL sells stranded pigtails, and the AlumiConn instructions permit stranded copper within their stated range. Match the other end to a terminal that accepts that conductor or the supplied terminal fitting.
How much wire goes into 24 eight-inch pigtails?
Twenty-four leads at IDEAL's 8 inch stock length total 192 inches, or 16 ft of wire. With one incoming wire, one outgoing wire and one device lead at each splice, the takeoff also needs 24 connectors accepting three conductors. Specify the circuit layout, including any shared-neutral circuit, separately from that material count.
Sources checked
Also defined as
- A short tail spliced to the circuit conductors so the device is not in the through-current path
- A spliced tail to a device so removing the device does not break the through neutral