Field glossary · property
TR / WR
A TR / WR receptacle combines tamper-resistant contact openings with weather-resistant device construction; the markings still leave its electrical configuration to be specified. Leviton's W5461-T00, for example, carries both properties on a 20 A, 250 V NEMA 6-20R single outlet. Record voltage, blade pattern, GFCI protection and box-and-cover requirements separately so an order for 'TR/WR' does not leave the actual outlet arrangement unresolved.
Tamper-resistant (shuttered, required in dwellings) and weather-resistant (damp and wet locations)
Use the code edition with the receptacle schedule
NFPA's Code-Making Panel 18 record for the 2026 NEC cycle places tamper-resistant receptacles at 406.26. Leviton's W5461-T00 product page still refers to 406.12, the earlier section number. Put the adopted edition beside the requirement on the schedule so the two references are not mistaken for different device properties.
The panel chair's published account of the 2026 NEC identifies park and recreation areas at 406.26(11), while NFPA's development record documents the added location. Neither publication establishes local adoption. Identify the applicable edition from the job's permit basis before applying its location list.
TR and WR are available on a NEMA 6-20R device
Leviton identifies W5461-T00 as a tamper-resistant and weather-resistant, 20 A, 250 V, NEMA 6-20R single receptacle. That manufacturer record provides a concrete counterexample to the assumption that TR/WR only describes familiar 125 V duplex outlets. The blade configuration and voltage remain essential order information.
The same Leviton product accepts #14 through #10 AWG solid or stranded conductors. That terminal range supplies another receiving check beyond the front-face markings. An order line reading '20 A, 250 V, NEMA 6-20R, single, TR/WR' establishes the configuration, while the terminal range and enclosure accessories complete the material review. Use the NEMA configuration guide when reconciling the plug and receptacle schedule.
Weather resistance belongs to the device, not the whole opening
Leviton's W5461-T00 product description connects weather resistance with protection against corrosion, ultraviolet degradation and cold-impact damage. It does not describe a weather-resistant device as a complete box-and-cover assembly. Keep the box, cover and receptacle as distinct schedule items so one WR marking is not credited to the entire installation.
At receiving, capture the catalog number and marked rating beside the required box and cover. Add a separate GFCI-protection field: a weather-resistant ordinary receptacle does not acquire a GFCI function from its WR marking. Resolve those items on the device schedule before cartons are distributed to outlet locations.
Distinctions
- TR versus GFCI
- TR concerns access to receptacle contacts. GFCI concerns interruption in response to a ground-fault imbalance; neither designation substitutes for the other.
Frequently asked questions
Does WR mean the receptacle is waterproof?
WR identifies the device construction, including the corrosion, UV and cold-impact resistance described by Leviton. The installation still has a separately selected box and cover. The WR marking alone does not identify that assembly's protection with a cord connected.
Sources checked
Also defined as
- Tamper-resistant (shuttered slots) and weather-resistant (moisture-rated) markings