Field glossary · measurement
Continuity
Continuity means an electrical path passes current between the tested points. A meter's continuity function reports resistance against its own audible threshold; the sound does not establish zero resistance or acceptable bonding resistance. Read the numerical result, identify which parallel paths remain connected, and select an instrument with the resolution the acceptance criterion requires. Continuity measurements belong on isolated, de-energized circuits with stored energy discharged.
An electrically continuous path, confirmed as near-zero ohms end to end with a low-resistance ohmmeter or continuity tester
What resistance makes a continuity tester beep?
Fluke specifies the 114, 115, and 117 continuity beeper as on below 20 ohms and off above 250 ohms. Those are separate guaranteed limits, not a universal 50 ohm threshold. Read the manual for the particular meter rather than transferring one instrument's behavior to another. Resistance between the published on and off limits requires attention to the displayed value.
A 10 ohm path meets the Fluke manual's beeper-on condition. That value would be a substantial resistance in a conductor or bond intended to offer a very low resistance return. The meter reports the path it measures; the circuit specification decides whether that path is acceptable. The multimeter troubleshooting guide explains how continuity fits the larger diagnosis.
Read the display before judging a bond
Fluke lists 1 ohm display resolution for continuity on the 114, 115, and 117, compared with 0.1 ohm on their lowest resistance range. A displayed zero in the continuity function therefore cannot establish a milliohm result. Resolution describes the smallest displayed increment; it does not promise that every displayed digit is accurate.
SCHLEICH recommends a four-wire resistance measurement when low resistances below roughly 1 to 10 ohms must be determined accurately. Its Kelvin arrangement injects current through one lead pair and senses voltage through another pair at the tested object, greatly reducing the contribution from test leads and their contacts.
With a two-wire setup, a 0.20 ohm lead-and-contact contribution added to a 0.05 ohm path produces a 0.25 ohm reading. Shorting the leads establishes the offset for that contact arrangement. A four-wire instrument is the stronger choice when moving probes or changing contact pressure would materially change the answer. Record the function, range, test current where available, and lead arrangement with the resistance.
Why parallel paths conceal an open conductor
Two test points can remain connected through another winding, a bonded enclosure, or another conductor after the intended path opens. The instrument then sees that alternate route. Isolating the component changes the measurement from a network result to the particular conductor or device under examination.
For two connected 10 ohm paths in parallel, the measured equivalent resistance is 5 ohms. If one path opens, the remaining 10 ohm path still satisfies the cited Fluke beeper-on limit. A sound from the tester therefore does not identify which branch is intact. Keep the intended endpoints and the isolation state in the test record, especially where a grounding network contains deliberate parallel bonds.
Capture intermittent opens within the meter's response
Fluke specifies detection of opens or shorts lasting 500 microseconds or longer in the cited meters' continuity function. An intermittent open interrupts an existing continuity tone; restored low resistance permits the tone again. Listen for breaks while gently moving a disconnected cord or connector, and use the displayed resistance to judge the path. The detection specification does not promise that every short event will appear as a stable display reading.
Distinctions
- Protective bonding acceptance
- Acceptance evaluates the required return path with specified measurement conditions and limits. An audible continuity result supplies neither those conditions nor a measured low-resistance value.
Frequently asked questions
What else can cause an OL indication?
OL means the selected measurement exceeds the instrument's range. An open switch, a disconnected probe, the wrong endpoints, or an open conductor can produce that result. Confirm the leads and the intended path before assigning the fault.
Sources checked
Also defined as
- Whether a path is complete end to end, reported as a beep below a low resistance threshold