Field glossary · safety
Live-dead-live
Live-dead-live verifies a voltage tester before and after an absence-of-voltage measurement on the equipment being worked. The two known-source checks support trust in the intervening result. They do not replace isolation, lockout, stored-energy control, or testing the actual parts exposed to the worker. Use a proving source suited to the tester's AC or DC function and input characteristics; the last live indication must validate the same testing setup.
Proving a voltage tester on a known live source, testing the circuit dead, then proving the tester again to confirm it did not fail
OSHA and NFPA use different verification language
OSHA 29 CFR 1910.333(b)(2)(iv)(B) expressly requires test-equipment operation checks immediately before and after testing circuits above 600 V nominal. The same paragraph requires a qualified person to verify the exposed circuit elements and equipment parts are de-energized, including checking for induced voltage and unrelated backfeed. That exposed-parts verification requirement is not confined to circuits above 600 V.
Fluke's absence-of-voltage guidance describes known-source checks on both sides of the equipment test as part of the NFPA 70E safety practice. NFPA lists the 2027 edition as current on November 5, 2026. Keep that practice distinct from OSHA's specifically worded above-600 V operation-check requirement; the voltage threshold is not a reason to trust an unproved tester on a 480 V circuit.
The lockout/tagout guide addresses the overall isolation process. The narrower question here is whether the test instrument, leads, selected function, and point of measurement support the claimed absence of voltage.
Choose a proving source for the meter's function
Fluke specifies its PRV240 proving unit at 240 V AC RMS or DC, ±10 percent, with a load of at least 1 megohm. That is a nominal-output specification with a stated loading condition. A high-impedance meter therefore has a specified source range of 216 to 264 V when used under those conditions.
For a low-impedance load above 3 kilohms, Fluke instead lists a typical 60 V AC output and a minimum 50 V AC RMS output. A lower indication with a compatible low-impedance tester can follow from the source's loading characteristic. Judge the verification against the proving-unit and tester instructions together, rather than expecting every connected instrument to display 240 V.
Match AC and DC functions deliberately. A successful AC response does not establish the DC measurement function, and an internal self-test does not exercise the complete external lead and probe path. A proving source supplies a known electrical stimulus; it does not calibrate the meter across its entire range.
What the final live check actually validates
Keep the same measurement function and lead arrangement through the verification sequence. Changing a lead, jack, function, or accessory after the first check changes the setup being verified. The final known-source result supports the instrument's operation, but cannot prove that the probes touched every intended test point. Identify the exposed parts actually tested; a correctly working meter can still read zero at the wrong location.
A failed final check leaves the intervening absence reading unverified. Re-establish instrument operation and repeat the affected absence test under the electrical safety program before relying on the result. Record the test location, instrument identity, selected function, proving source, and both verification results so a reviewer can connect the claimed safe condition to the actual test.
Distinctions
- Calibration
- Calibration evaluates measurement accuracy against references. Live-dead-live checks operation surrounding a particular absence test; a current calibration certificate does not replace it.
Frequently asked questions
Does OSHA's 600 V wording mean no test is required at 480 V?
OSHA still requires the qualified person to verify that the exposed parts are de-energized. The above-600 V wording specifically modifies the immediate before-and-after equipment-operation checks in that paragraph.
Does a zero reading at the disconnect cover the work location?
Test the parts to which the worker will be exposed. Isolation elsewhere does not rule out backfeed or another voltage source at the actual point of work.
Sources checked
- OSHA: 29 CFR 1910.333(b)(2)(iv)(B), qualified-person verification and immediate checks above 600 V nominal
- U.S. Government Publishing Office: official CFR text of 29 CFR 1910.333, 2025 annual edition
- NFPA: NFPA 70E, Standard for Electrical Safety in the Workplace, current 2027 edition
- Fluke: About absence of voltage testing, live-dead-live practice and relationship to NFPA 70E
- Fluke: PRV240 Proving Unit data sheet, output tolerance and high- and low-impedance loading conditions
Also defined as
- Proving the meter on a known source, reading the circuit dead, then re-proving the meter