LOTO
LOTO stands for lockout/tagout. A current procedure-inspection date does not prove a machine ready for maintenance: OSHA 29 CFR 1910.147(d)(6) requires verification of isolation before servicing begins. The employer separately inspects procedures at least annually and retrains workers after relevant changes or deficiencies. These are three different controls: today's isolation, the procedure's continued adequacy, and the employee's ability to use it. A training date alone establishes neither isolation nor a completed procedure inspection.
Lockout/tagout, the isolation and verification of hazardous energy before work
Which LOTO rule applies to electrical or construction work?
OSHA 1910.147(a)(1)(ii) excludes construction employment and electrical exposures governed by Subpart S. For electrical work covered by 1910.333(b)(2), Note 2 accepts a procedure complying with 1910.147(c) through (f) only if it addresses Subpart S hazards and incorporates 1910.333(b)(2)(iii)(D) and (iv)(B). Those additions cover tag-only safeguards and testing by a qualified person, including induced voltage and backfeed.
Construction rule 1926.417(b) requires deenergized equipment or circuits to be rendered inoperative, with tags at every point from which they could be energized. This is the citation to identify on temporary-power work. NFPA lists NFPA 70E, Standard for Electrical Safety in the Workplace, 2027 edition, as current.
What makes a tag attachment suitable for LOTO?
OSHA 1910.147(c)(5)(ii)(C)(2) requires a tag attachment with at least 50 pounds of unlocking strength: nonreusable, attachable by hand, self-locking, and nonreleasable. Its design must be at least equivalent to a one-piece nylon cable tie suited to environmental exposure. The 50-pound requirement rates the attachment, not the padlock; lockout devices have a separate requirement to resist removal without excessive force or unusual techniques.
Match the attachment's documented rating and environmental suitability to the installation. A reusable tie fails the nonreusable requirement even when it holds a correctly printed tag. OSHA 1910.147(c)(5) also requires identification of the applier, resistance to expected exposure, and dedicated energy-control use. A toolbox padlock used interchangeably for LOTO fails that last requirement.
What if pressure rebuilds after the equipment is locked out?
OSHA 1910.147(d)(5)(ii) requires continued verification of isolation while stored energy could rebuild to a hazardous level, until servicing ends or that possibility is eliminated. A pressure gauge that rises after bleed-down reveals returning energy; its earlier zero reading cannot establish continued protection. The equipment procedure needs to address that failure, not just record the initial reading. Use the lockout/tagout field guide for the complete isolation sequence.
Who inspects the procedure, and what gets certified?
OSHA 1910.147(c)(6)(i)(A) assigns the periodic inspection to an authorized employee who is not performing the procedure under inspection. NIOSH Publication 2022-106 calls for observing the procedure during actual servicing or maintenance; the inspector cannot perform part of it and then inspect that work. A supervisor's title alone does not establish eligibility to inspect.
OSHA 1910.147(c)(6)(ii) requires inspection certification to name the equipment, date, employees included, and inspector. The inspector reviews responsibilities with every authorized employee using a lockout procedure; for tagout, affected employees and tag limitations also enter that review. Section 1910.147(c)(6)(i)(B) requires correction of identified deviations or inadequacies. A separate correction log distinguishes open findings from completed fixes.
NIOSH Publication 2022-106 describes the annual interval as 12 months; procedures used less frequently are inspected when used. A procedure used monthly and inspected on November 5, 2025 is due again by November 5, 2026. A December inspection would leave a gap even though both calendar years contain an inspection.
When does a LOTO change require retraining?
OSHA 1910.147(c)(7)(iii) requires retraining for authorized and affected employees after job-assignment changes, equipment or process changes introducing hazards, procedure changes, or evidence of deficient knowledge or practice. Adding a pneumatic actuator to a conveyor triggers retraining when it introduces a new hazard; waiting for the annual inspection would miss that trigger.
Training certification under 1910.147(c)(7)(iv) names each employee and the training dates. Add the procedure revision to that record in the MOP library so the work assignment identifies which version the employee learned. The revision reference is a useful recordkeeping practice beyond OSHA's specified certification fields.
Distinctions
- Exception from documenting a procedure
- OSHA 1910.147(c)(4)(i) exempts documentation only when all eight conditions hold: no hazardous stored or residual energy or reaccumulation; one readily identified, isolatable source; complete deactivation by isolation and locking; lockout throughout servicing; one lock sufficient; exclusive authorized-worker control; no servicing hazards to others; and no employer accidents involving unexpected activation or reenergization while using this exception. A single electrical feed with stored pneumatic energy fails the first condition. Actual isolation and lockout remain required.
Frequently asked questions
Do OSHA lockout padlocks have to be red?
OSHA 1910.147(c)(5)(ii)(B) permits facility standardization by color, shape, or size, with at least one of those criteria required. Red is not prescribed. Tags additionally need standardized print and format. A different-colored lock is not automatically unsuitable if the facility standardizes its shape or size.
Does a two-minute repair qualify as minor servicing?
Duration alone does not establish OSHA's minor-servicing exception in 1910.147(a)(2)(ii). The activity must occur during normal production, be routine, repetitive, and integral to production, and use alternative measures that provide effective protection. A short task description establishes none of those conditions.
Sources checked
- OSHA 29 CFR 1910.147: scope, hardware, stored-energy reaccumulation, inspections, training, and exceptions; official 2025 CFR text
- OSHA 29 CFR 1910.333(b)(2): Note 2, tag-only safeguards, and qualified-person electrical testing; official 2025 CFR text
- OSHA 29 CFR 1926.417(b): construction circuits rendered inoperative and tagging at energization points; official 2025 CFR text
- NIOSH Publication 2022-106, December 2021: 12-month inspection interval, inspector independence, observation, and certification
- NFPA: NFPA 70E, Standard for Electrical Safety in the Workplace, current 2027 edition
Also defined as
- Electrical: Lockout/tagout, isolating and securing energy sources so equipment cannot be re-energized while someone is servicing it
- Plumbing: Lockout/tagout, the method for isolating and de-energizing pumps and equipment before entry