Field glossary · safety
IDLH
IDLH, immediately dangerous to life or health, is a respiratory hazard classification that includes conditions capable of disabling escape, even before they become fatal. It is not an allowable workday exposure limit. NIOSH lists carbon monoxide at 1,200 ppm IDLH and nitrogen dioxide at 13 ppm. OSHA also requires IDLH treatment when the employer cannot identify or reasonably estimate exposure, so a missing measurement does not establish a non-IDLH atmosphere.
Immediately dangerous to life or health, an atmosphere or condition that demands trained entry rescue and supplied air
IDLH versus routine exposure limits
NIOSH's Pocket Guide bases IDLH values on threats to escape and irreversible harm, including severe irritation, disorientation and loss of coordination following respirator failure. A concentration below IDLH can still exceed a recommended exposure limit. Keep the averaging period beside each number: a time-weighted average, short-term limit and ceiling answer different exposure questions.
Record whether a monitor value is an instantaneous reading, a stored peak or a calculated average before comparing it with a limit. NIOSH defines its short-term exposure limit as a 15-minute average unless otherwise specified; a single display reading is not that average. Its ceiling recommendation applies throughout exposure and must not be diluted into a shift average.
Carbon monoxide and nitrogen dioxide IDLH values
The current NIOSH Pocket Guide lists carbon monoxide's IDLH at 1,200 ppm and nitrogen dioxide's at 13 ppm. NIOSH's September 2017 nitrogen dioxide profile establishes 13 ppm and identifies 20 ppm as the older 1994 IDLH value. Match the chemical name, CAS number and publication date when updating an exposure record; an older nitrogen dioxide reference changes the decision threshold.
| NIOSH Pocket Guide substance | IDLH concentration | Separate NIOSH recommended exposure limit |
|---|---|---|
| Carbon monoxide, CAS 630-08-0 | 1,200 ppm | 35 ppm time-weighted average, up to a 10-hour workday during a 40-hour workweek; 200 ppm ceiling |
| Nitrogen dioxide, CAS 10102-44-0 | 13 ppm | 1 ppm short-term exposure limit, 15-minute average |
Why an unknown exposure counts as IDLH
OSHA 29 CFR 1910.134(d)(1)(iii) requires IDLH classification when the employer cannot identify or reasonably estimate employee exposure. A normal oxygen reading and a zero CO reading do not measure another contaminant for which the monitor has no channel. Establish the missing exposure rather than treating absent data as a zero result.
Carry the chemical identifier, exposure estimate, averaging period and monitor channels into the respiratory protection program. Where the work involves a permit space, link that determination to the entry record. A channel list makes the measurement's coverage explicit: a CO result is not a nitrogen dioxide result.
The two different 30-minute references
NIOSH bases IDLH values on effects associated with a 30-minute exposure, but its Pocket Guide directs immediate exit following respirator failure. The toxicological duration is not a permitted unprotected stay.
OSHA 1910.134(d)(2)(i)(A) attaches a separate 30-minute minimum NIOSH-certified service life to its full-facepiece pressure-demand SCBA option. Paragraph (B)'s alternative is a combination full-facepiece pressure-demand supplied-air respirator with auxiliary self-contained air supply; the SCBA option's 30-minute wording does not specify the auxiliary supply's duration. Keep the toxicological reference, SCBA rating and auxiliary escape supply distinct in the equipment record.
Distinctions
- Assigned protection factor
- An APF supports maximum-use-concentration calculations for non-IDLH respirator selection. OSHA 1910.134(d)(3)(i)(B)(2) prohibits using those calculations to authorize respirators in IDLH conditions; the IDLH equipment requirements control.
Field example
A logged 15-minute nitrogen dioxide average of 2 ppm is twice NIOSH's 1 ppm short-term exposure limit, although it is below the 13 ppm IDLH value. Record an exceeded NIOSH short-term limit, not an acceptable exposure based on the IDLH comparison. The Pocket Guide lists these as separate criteria; neither substitutes for the other.
Frequently asked questions
What oxygen percentage triggers IDLH treatment?
OSHA 1910.134(b) defines oxygen deficiency as below 19.5% by volume, and (d)(2)(iii) requires IDLH treatment. Its Table II exception permits other atmosphere-supplying respirators only when the employer demonstrates that oxygen will remain within the table's altitude-specific ranges under all foreseeable conditions. That exception does not authorize air-purifying equipment.
Can an escape-only respirator be used to enter an IDLH atmosphere?
No. OSHA 1910.134(b) defines escape-only equipment for emergency exit. Its certification does not authorize entry or work in that atmosphere.
Do IDLH rescue provisions apply outside confined spaces?
Yes. OSHA 1910.134(g)(3) applies to all IDLH atmospheres: it requires one employee outside, more when needed, maintained communication, and personnel trained and equipped for effective emergency rescue. Those duties attach to the atmospheric classification even when the location is not a permit-required confined space.
Sources checked
- NIOSH Pocket Guide introduction: exposure averaging periods, IDLH purpose and 30-minute basis
- NIOSH Pocket Guide: Carbon monoxide, CAS 630-08-0, IDLH and recommended exposure limits
- NIOSH Pocket Guide: Nitrogen dioxide, CAS 10102-44-0, IDLH and short-term exposure limit
- NIOSH: IDLH Value Profile for Nitrogen Dioxide, Publication 2017-202, September 2017, current value on page 1 and historical value in Table 2
- OSHA 29 CFR 1910.134: definitions and paragraphs (d) and (g)(3), official July 1, 2025 CFR edition
- OSHA: current online text of 29 CFR 1910.134, checked November 5, 2026
Also defined as
- HVAC: Immediately dangerous to life or health; requires SCBA or supplied air, never a cartridge