Field glossary · process
Chain of custody
Chain of custody connects a specifically identified item to the evidence later reviewed through a recorded sequence of possession, copying, transfer and storage. A photo file, laboratory sample and retired drive each need an identity that survives the handoffs. A complete transfer log establishes who handled that item and what happened to it; file-integrity checks separately establish whether the produced digital copy matches the preserved baseline.
The documented, unaltered path of a photo from capture to production, which supports its authenticity in a dispute
Make each handoff identify the same item
NIST SP 800-86 describes a custody record that logs each person who possessed evidence, their actions and the corresponding times. For a file, retain its original identity, collection source and integrity digest. For a physical item, retain its sample, tag or serial identifier and the container or seal identification that travels with it.
A courier receipt saying one box was delivered does not identify the twelve drives inside it. Tie the package inventory to its individual serials and reconcile the received contents. Samples and restoration contents likewise need an identity that survives collection, transport and review.
- Item or file identifier, collection source and associated package or seal
- Releasing and receiving custodians, with transfer time and destination
- Purpose of transfer, action taken and received condition
Use a hash as an integrity comparison
NIST SP 800-86 recommends preserving evidence, performing analysis on copies and verifying their integrity. Compute and retain a digest at the controlled baseline, then compare the production copy with that baseline. Matching digests support byte-for-byte continuity from the saved baseline; capture circumstances and the meaning of the image require their own supporting record.
Keep an annotated photograph as a separately identified derivative linked to the original. Cropping, drawing an arrow or recompressing the image creates a different digital object even when the pictured condition remains recognizable. Preserve the edit history and the original rather than expecting one digest to identify both objects. Store the photo capture context with the original, then link each derivative to that preserved object.
Connect production and disposal to the custody record
Federal Rule of Evidence 902(14), in the rules effective December 1, 2025, permits a qualified person's certification of digitally identified copies. Through Rule 902(11), it also requires reasonable written notice before trial and access to the data and certification for inspection. Keep the export method, certifier and integrity comparison with the delivered package; these establish the copy's authentication history.
NIST SP 800-88 revision 2, published September 2025, calls for sanitization documentation identifying the medium's manufacturer, model and serial number, along with the method, tool, verification and validation information. A disposal certificate tied to those identifiers closes a media history more clearly than a weight ticket for a mixed shipment. Carry that history into the decommissioning record.
Distinctions
- Contemporaneous
- Describes when a record was made relative to an event. Custody describes the subsequent handling of an identified item.
- Authentication
- Establishes that an offered item is what it is claimed to be. Custody and integrity evidence support that question through different facts.
Frequently asked questions
Does forwarding a photo preserve its chain of custody?
Record the transfer and compare the actual attachment with the preserved original. Messaging systems can generate a resized derivative instead of forwarding the original bytes.
Is a destruction certificate enough for retired drives?
Link its listed serials and treatment record to the inventory released from the facility and the intermediate transfers. That connection identifies which drives the certificate covers.
Sources checked
Also defined as
- Plumbing: The timestamped trail showing who had each item, when, and where it went, from pickup to return
- The unbroken logged record of who held each asset, when, and where, from rack to recycler