Field glossary · component
SOC
SOC means security operations center in a physical-security plan. It combines monitored events, operator decisions and dispatch into a response function with defined coverage hours. One continuously staffed post requires 168 coverage hours each week, before relief and overlap. In a battery schedule, SOC instead means state of charge. Spell out the intended meaning in commissioning records so a security staffing requirement cannot be mistaken for a battery operating condition.
Security operations center, the staffed room that watches and dispatches the response
Size coverage hours before counting operator seats
The RCMP's GCPSG-003 design guide, effective August 9, 2021, describes a physical-security SOC as a facility for monitoring, control, management and response, typically supporting 24-hour surveillance. Its operational planning includes staffing, task rotation and equipment redundancy. A collection of monitors does not establish that coverage.
One continuously occupied post requires 24 x 7 = 168 staffed hours per week. At 40 scheduled hours per person, that is 4.2 person-weeks before leave, training or overlap is covered. Two simultaneous posts require 336 staffed hours. State the required posts and coverage rather than equating the number of chairs with the staff available.
Include the equipment room in the continuity design
The RCMP guide recommends locating the SOC equipment room adjacent to the control suite so UPS and emergency power can support both spaces. It also calls for at least 50 percent spare equipment-room capacity for growth. Those are recommendations for the Canadian federal design context identified by the guide, rather than a general U.S. building-code minimum.
A continuity review should follow the cameras, access-control servers, recording storage, network equipment, operator stations and communications through their supporting power and cooling. Keeping an operator display alive while its recording server has lost power preserves a screen without preserving the monitored service. Include the supporting rooms in the operating-state review.
Measure the complete alarm-to-response interval
The Canadian Centre for Cyber Security's PE-06 physical-access controls connect monitoring with review of access logs and coordination of investigation and response. Preserve event identity, location and timestamps across the access-control system, video system and dispatch record so those steps can be reconstructed.
An alarm at 10:00:00, acknowledgment at 10:00:12, dispatch at 10:00:30 and arrival at 10:02:00 produce a two-minute total response. The components are 12 seconds to acknowledge, 18 more seconds to dispatch and 90 seconds in travel. That breakdown identifies a different improvement than reporting acknowledgment alone. The physical-security guide explains the surrounding detection and access layers.
When SOC appears on a battery trend
The System Advisor Model defines battery dispatch limits as percentages of available battery capacity, which changes with degradation and replacement. A displayed state-of-charge percentage therefore needs its capacity reference when used to estimate remaining energy. Record the battery system, reported SOC, available-capacity basis and time together; a security-center staffing record has none of those meanings.
Distinctions
- Battery state of charge
- This SOC belongs to a battery operating record. Expand it beside charge limits and energy estimates so its capacity basis remains visible.
- Operator post
- A post is a function that needs coverage. One physical chair can require several people across the week, so seat count and staffing count are separate.
Frequently asked questions
Must a physical-security SOC be on site?
The monitoring function can be local or centralized. Identify the actual monitoring location, response organization and communications path in the facility security program.
Sources checked
Also defined as
- State of charge, how full the battery is now, as a percentage of usable capacity