Free egress

On a free-egress door, a denied credential outside does not prevent a person inside from opening the door through ordinary hardware operation, without a key, learned release sequence, or unusual effort. Identify whether the inside lever mechanically retracts the latch or an electrical release removes holding power. A sensor-release exit button's 30-second unlock period is time available to leave immediately, not permission to delay someone's exit.

The requirement that occupants always exit a controlled door without a key, credential, code, or tool, usually with one releasing motion

Used across 2 Anvilfield field guides, most in Electrical.
Updated

Identify the release path before testing the door

BHMA's 2024 IBC guidance assigns access control that leaves ordinary egress intact to section 1010.2.9. A credential reader outside does not establish which release arrangement is present inside. Trace the latch or magnet that actually holds the door.

Allegion distinguishes door hardware release under 1010.2.10 from sensor release under 1010.2.11. Both electrical arrangements must release on power loss; the sensor arrangement adds the separate manual release and applicable fire-protection signals. The table identifies the differences to carry into the door test, using the 2024 IBC basis.

ArrangementWhat releases the doorDiagnostic distinction
Ordinary access control, 1010.2.9Mechanical egress hardwareReader denial must not stop the inside release
Door hardware release, 1010.2.10A switch in the door-mounted hardware interrupts lock powerOperating a remote software button does not prove the hardware switch works
Sensor release, 1010.2.11Approach sensor plus independent manual and emergency releasesPassing the approach test does not prove the other releases work

Measure the manual exit button at the lock

Allegion specifies that the sensor-release manual switch must interrupt lock power independently of other electronics and hold the lock released for at least 30 seconds. Time the actual unlocked condition after operating the switch.

A lock that releases immediately but re-engages after 26 seconds misses the minimum by 4 seconds. A controller screen set to 30 seconds does not settle the result if another supply or control path restores holding power early. Record the observed release and relock times in the access-control commissioning test.

Allegion's fire-protection guidance requires sensor-release locks to unlock on the specified fire-alarm, sprinkler, or detection signals where those systems are present, and remain unlocked until reset. A passing 30-second button test does not prove that sustained fire-event release.

Panic hardware rules out the sensor-only choice

BHMA identifies 2024 IBC section 1010.2.8 as prohibiting sensor-release electrical locking arrangements on doors required to have panic or fire exit hardware. With a maglock at such a door, the panic device must itself release the electrical lock through the door-hardware-release arrangement.

A replacement panic device without the required switch can leave the motion sensor opening the door while removing the approved release path. Include the panic device's electrical function in the replacement scope, not just its latch dimensions and finish.

Unlocking, unlatching, and delayed egress are different results

Allegion explains that ordinary access control under 2024 IBC 1010.2.9 has no fire-alarm unlock requirement of its own. Fire-door latching and stair re-entry can impose separate actions. On a fire door with electrical latch retraction, the required fire response can be to project the latch so the closed door stays latched.

BHMA describes delayed egress under 2024 IBC 1010.2.12 as a separate approved arrangement with a usual 15-second delay, extendable to 30 seconds with AHJ approval. That delay concerns when exit becomes available. The sensor-release button's 30 seconds concerns how long an already released lock stays unlocked.

For a data-center security boundary, specify the result at the opening: release the magnet, permit re-entry, or restore positive latching. A generic instruction to unlock all doors loses those distinctions.

Distinctions

Fail-secure
Fail-secure describes the access side's power-loss behavior. To describe egress, also identify the inside release mechanism; the outside lock state alone is insufficient.

Frequently asked questions

Does a maglock always need a separate exit button?

The 2024 IBC sensor-release arrangement does. The door-hardware-release arrangement uses the switch in the door hardware and does not itself require that separate button or a fire-alarm release.

Can the access-control server provide the required manual release?

A network command is not the independent interruption required for the sensor-release manual device. The wiring and observed lock response must establish that function.

Sources checked

Also defined as

  • Datacenter: The life-safety rule that people can always exit, regardless of the lock state