Access control

Access control is the decision and enforcement process that permits a person to enter a particular place at an authorized time. Its useful field record connects a named person, an access permission, an actual entry point, and a dated event. A credential proves identity only to the strength of its authentication method; the permission record determines where that identity belongs.

Knowing and managing who is on the site through a controlled entrance, a sign-in, and a short, named after-hours key list

Used across 2 Anvilfield field guides, most in Concrete.
Updated

What an access permission must contain

Separate the person's identity from the access grant. A subcontractor can remain in the personnel directory after the permit to enter a switchgear room expires. Record the sponsoring organization, authorized doors or zones, start and end dates, and the person approving the grant. That separation prevents a valid badge from silently becoming a permanent building pass.

NIST SP 800-53 Revision 5, control PE-2, specifies access-list removal when a person no longer needs entry and access-list reviews at an organization-selected interval. These controls concern facilities housing information systems; the owner's selected control set establishes their use on a project. The current Revision 5 catalog release is 5.2.0, issued in August 2025.

Prove revocation at the controller

NIST SP 800-116 Revision 1 treats credential validation as checking legitimate issuance, the activation date, expiration, tampering and revocation. An issued card whose activation date is tomorrow is not valid for entry today. For federal PIV systems, those checks precede the separate decision about which rooms the holder is permitted to enter.

Test revocation at the same reader that first granted access to the credential, and record the denial reason after revocation. Keep the credential identifier, controller connection state and attempted-entry time with both results. An offline test checks cached permissions and local expiration; a connected test establishes whether centrally changed permissions have synchronized.

Keys and audit records have separate jobs

NIST SP 800-53 Revision 5, PE-3, lets the organization specify scheduled key and combination changes, changes triggered by loss, compromise, transfer or termination, or both. Put the selected triggers in the key register. Revoking a badge leaves a mechanical key usable until the lock or keying arrangement changes.

PE-3 also calls for physical-access audit logs at designated entry or exit points. Preserve the event time and the controller's clock basis so a door event can be matched to video. Keep those permission records with the jobsite security plan so incident review can establish who was authorized at the time of entry.

Distinctions

Authentication
Establishes the identity presented at the reader. Authorization assigns that identity a permitted place and time.
Occupancy count
A count requires reliable entry and exit capture. A list of successful badge reads alone does not account for unrecorded exits or people following another entrant.

Field example

A technician has permission for three doors until 18:00. At 18:05, the acceptance record shows denied access at all three, including a controller disconnected from the server during the test. The result demonstrates expiration at the door; it does not establish that the technician has left the building. A separate test revokes an unexpired badge while the controller is disconnected, then repeats the attempt after synchronization. The two results identify the interval during which cached permission still permits entry.

Frequently asked questions

Does deleting a user cancel every way into the building?

Only the credentials and permissions actually revoked. Track mechanical keys, shared codes, temporary passes, and controller synchronization alongside the user account.

Sources checked

Also defined as

  • Electrical: A system that decides who may pass through which door, when, using a credential, a reader, a controller, and an electric lock, while still allowing free egress

Where this shows up

Related guides

Next step: Find access system bids

Back to the full field glossary