Megohmmeter (megger)

A megohmmeter, often called a megger, measures insulation resistance from leakage under an applied DC test voltage: 500 V and 5 microamperes correspond to 100 megohms. That result belongs to a defined, de-energized test boundary. Connected electronics, surface leakage, temperature, and elapsed test time affect its meaning. A guard terminal separates selected leakage paths from the measurement; it neither repairs insulation nor replaces protective grounding.

An insulation-resistance tester applying a high DC voltage, read in megohms, de-energized only

Used across 2 Anvilfield field guides, most in Electrical.
Updated

Display resolution and measurement accuracy differ

Fluke's original 1550 manual specifies its accuracy for one year after calibration at 0 to 35 C. At 500 V, it lists accuracy of plus or minus 5 percent of reading from 200 kilohms to 10 gigohms and plus or minus 20 percent from 10 to 100 gigohms. A wide display range does not establish one accuracy across the whole range.

Twenty percent of a 20 gigohm displayed value is 4 gigohms. Additional decimal places do not reduce that published tolerance. Compare a change between tests with the applicable instrument specification as well as the asset's temperature and test conditions. Preserve actual applied voltage, elapsed time, and the instrument identification with the result.

The guard terminal separates surface leakage from the reading

Fluke's 1550 manual states that its guard terminal is outside the resistance-measurement path and can divert surface leakage from the measured current. Guarding changes which current is counted. It does not repair the insulation or establish that the excluded surface path is acceptable in service.

A 100 megohm bulk-insulation path in parallel with a 10 megohm surface path reads about 9.09 megohms when both paths enter the measurement. Excluding the surface path with the specified guard connection lets the instrument measure the bulk path separately. Save both connection descriptions when the distinction explains a low result; a bare "100 megohms" loses that diagnostic evidence.

Compare insulation-tester voltage ranges

Fluke's instrument comparison lists 50 to 1,000 V test selections for the 1587 FC and describes the 1550C FC as a 5,000 V insulation tester. Those are instrument capabilities. Select the applied voltage from the equipment's test instructions and isolate connected devices that those instructions exclude; the highest available setting is not an acceptance criterion.

Establish a dead circuit before testing and discharge afterward

Fluke's 1550 manual requires the circuit to be without power and its capacitance discharged before testing. Establish isolation and verify absence of voltage before connecting for an insulation test. After the test, the same manual requires the leads to remain connected until terminal voltage returns to zero so the discharge function can work. Record those two boundaries separately: dead before testing and discharged after testing. Pair the electrical troubleshooting record with the tester model, applied voltage, duration, lead arrangement, and guard connection.

Distinctions

Continuity tester
A low-ohms or continuity result checks a conducting path. It cannot substitute for the 500 V, 5 microampere insulation result in the worked example because the measurement stress and current range differ.
Withstand tester
A withstand test and an insulation-resistance measurement have different test objectives and acceptance criteria, even when both instruments apply elevated voltage.
Ground-resistance tester
Megger also names a manufacturer of ground-testing instruments. An earth-electrode resistance measurement and a high-voltage insulation-resistance measurement require different instrument functions.

Frequently asked questions

Does the guard lead connect to earth for every test?

Use the instrument's specified guard arrangement for the leakage path being excluded. Its measurement role differs from a protective earth connection.

Can I compare guarded and unguarded readings directly?

Identify them separately. They include different leakage paths, which is often the reason the values differ.

Sources checked

Also defined as

  • Datacenter: The instrument that applies a DC test voltage and reads insulation resistance in megohms or gigohms