Field glossary · measurement
Insulation resistance (IR)
Insulation resistance reports how strongly an insulating path resists current under an applied DC test voltage. Read it with the voltage, elapsed test time and insulation temperature. At 500 V, a stabilized leakage current of 1 microamp corresponds to 500 megohms by Ohm’s law. A changing reading can reflect charging or absorption current as well as a change in the insulating material.
The megohmmeter reading across insulation, phase-to-phase and phase-to-ground, recorded with temperature and humidity
Separate charging current from sustained leakage
Fluke’s insulation-tester guidance distinguishes capacitive charging current, absorption current and leakage current in an insulation test. The displayed resistance is calculated from the current present at that instant, so an early low value is not equivalent to a stabilized low value.
Fluke describes a one-minute spot reading as the usual timed measurement after initial charging current settles. Attach elapsed time and the actual applied voltage to each phase-to-phase and phase-to-ground result on the busway test record; a lone megohm value cannot be compared reliably with the next test.
Normalize the insulation temperature before comparing trends
Fluke gives the general temperature correction that insulation resistance halves for each 10°C increase above the baseline temperature and doubles for each 10°C decrease. This is a correction rule for comparison, with material-specific factors taking precedence where supplied.
A 400 megohm reading at 30°C corresponds to approximately 800 megohms at a 20°C reference under that rule. Comparing the raw 400 megohms with an earlier 800 megohms at 20°C would falsely suggest a fifty-percent deterioration. Measure the insulation or winding temperature represented by the correction, rather than substituting an unrelated room temperature.
Parallel paths explain why a longer assembly reads lower
Two equal 1,000 megohm leakage paths connected in parallel have a combined resistance of 500 megohms. Four equal paths produce 250 megohms. Added cable length, connected equipment or additional bus sections can therefore change the total even when each insulating segment is unchanged.
Fluke requires a verified de-energized circuit and excludes connected electronic power supplies, drives, UPS electronics and similar solid-state devices from insulation testing. Isolate those devices from the tested path and use the permitted test voltage for the remaining equipment. Fluke also identifies stored charge after testing: retain the specified discharge connection and verify discharge before handling the conductors. Record the isolated accessories so the next test uses the same boundary.
Interpret polarization index with its component readings
Fluke defines polarization index as the ten-minute insulation resistance divided by the one-minute resistance. A rise from 600 to 1,500 megohms gives PI 2.5. Save both component readings, because the ratio alone hides their absolute magnitude.
A time ratio describes how the measured current develops during that test. Its relevance and acceptance criterion depend on the insulation system. Compare the same configuration at a matched voltage and corrected temperature before treating a changed ratio as an equipment trend.
Distinctions
- Dielectric withstand
- A withstand test demonstrates behavior under a specified electrical stress. An insulation-resistance number measures leakage and does not replace that test.
- Continuity
- Continuity examines a low-resistance conductive path. Insulation testing examines a path intended to resist current.
Frequently asked questions
Should I compare the first reading with the last test?
Compare readings taken at the same elapsed time and test voltage, with temperature correction and matching circuit boundaries.
Is a higher test voltage always more informative?
The equipment’s permitted test voltage controls. Changing voltage changes the test condition and can stress connected components beyond their rating.
Sources checked
Also defined as
- The megohmmeter reading across insulation, taken as a baseline at receiving and recorded with conditions